China Steel Ridge Cap Roll Forming Machine, Find details about China Roll Forming Machine, Ridge Cap Forming Machine from Steel Ridge Cap Roll Forming Machine
hebei product roof ridge cap making machines for roof ridge cap steel
1.PLC computer control
2.operation is easy
3.running is steady and reliable
4.applies to roof ,walls and so on
5.no noise
Ridge cap machine technical parameters:
Suitable material | galvanized steel colored coil |
Thickness of the plate | 0.3-0.8mm |
Productivity | 8-12m/min |
Roller steps | 14 rows |
Roller material | 45# steel |
Diameter of active shaft | 70mm |
Wall thickness of the main forming machine | 14mm steel plate
|
Main forming machine body | 300mm H steel |
Transmission chain | 0.6'' (inside hang) |
Reducer | 2.2kw Xingxing Cycloid which works stably and no noise |
control systerm | Matsushita or Mitsubishi PLC control systerm |
Dimensions of major structure | 4000mm*500mm*1100mm |
Counte | Omron |
Voiltage | Single phase/ 220-240 volts |
Processes: Manual decoiler-Roll forming machine-PLC system-Hydraulic system-Post cut-Stacking
Components of line:
NO | Name | Unit | Qty |
1 | Manual decoiler | set | 1 |
2 | Main machine for roll forming | set | 1 |
3 | PLC Control system | set | 1 |
4 | Hydraulic system | set | 1 |
5 | Post cut | set | 1 |
6 | Stacking | set | 1 |
Sales terms
Terms of Payment: 30% of the total contract value paid by T/T as down payment, the rest 70% of the total contract value to be paid by T/T after inspection by buyer in seller's factory while before delivery.
Delivery: 30 days after receipt of advance payment
Service: we sent technician to your country to fix the machine.
The buyer should bear all the cost including: visa , Roundtrip ticket and suitable accommodation, also buyer should pay the salary 50USD/day.
Warranty: 12 months limited warranty
During warranty: parts are free but buyer pay for the shipping fee
Packaging & Shipping
1:How to play order:
Inquiry---confirm the profile drawings and price---confirm the PI---arrange the deposit or L/C---then OK
2:How to visit our company:
Fly to Beijing airport: By high speed train From Beijing Nan to Cangzhou Xi(1 hour),then we can pick up you.
Fly to Shanghai Airport:By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5hours),then we can pick up you.
If any questions,you can call me mobile phone at any times:0086-15613790178
3:When we exported the machines:
We have beening making and exporting the machines since from the year of 1998.
4:If you want to get more pictures or videos of the machines,I can send them to you by Email or Skype