1. Steel Structure Workshop
Steel Structure Workshop can be used for kinds of building, which includes monospan steel frame, double-span steel frame and multi-span steel frame. It can assemble the crane. For portal steel frame light house steel construction, the formed steel sheet and cold bend thin wall purline should be used as the roof. Steel column and steel girder of it should adopt welding H steel, which material are Q235 or Q345.
2. Light Steel Structure Building Introduction
Light steel structure building is a new type of building structure system,which is formed by the main steel framework linking up H section,Z section,C section or U section steel components,roof and walls using a variety of panels and other components such windows,doors,cranes,etc.Light steel structure building is widely used as warehouses,workshops,large factories...etc.
3.Steel Structure House Advantages
1.Good in heat and sound insulation, good corrosion resistance and light weight;
2.Roofing and wall uses light sandwich panel or color single panel, which has good earthquake resistance and integration;
3.Multiple disassembly and assembly, with the rate of recovery up to 70%.
4.Steel Structure House Usage
Steel structure is widely used in the construction site as temporary office, factory, warehouse, city office, civil resettlement, 4S stores and other temporary buildings,etc.
1 Size | Min diameter-L5700mmX W 3800mmXH 2850mm Color-white or blue/red---Depend on you |
2 Steel Frame | C-Profile Steel frame-2.0mm poles |
3 wall | EPS/Rockwool sandwich panels |
4 Roof | EPS/ Rockwool sandwich panels |
5 Base | (1)One floor-The first floor need be flat before assemble house (2) two or three floor-The second and third floor is 18mm plywood, Aisle Panel is 2.5MM checkered steel panel |
6 Door(1pc) | Steel security door(with keys) |
7 window(2pcs) | Sliding PVC windows:Size--800mm*1100mm---Depend on you |
8 Usage | Temporary housing in the construction sites, commercial offices, civil, military areas, meeting rooms, dormitories,reception center and shops and so on |
9.Electricity | (1)1 distribution box;1 circuit breaker; (2)2 Ceiling lights ; 3 sockets; (3)1 switch; 3C electric wires |
10.Drainage system | 4pcs PVC water pipes |











