Fast Install Strong Steel Structure Fence Iron Railing

China Fast Install Strong Steel Structure Fence Iron Railing, Find details about China Steel Fence, Iron Fence from Fast Install Strong Steel Structure Fence Iron Railing

Model NO.
LXB-37
Type of Steel For Building Structure
High-Strength Steel
Carbon Structural Steel
Q235
Residential Wall Structure
Wall Support
Application
Steel Workshop, Steel Structure Platform, Frame Part, Steel Fence
Raw Materials
Rectangle Tube and Steel Plate
Surface Treatment
Painting & Powder Coat
Life Time of Steel Frame
More Than 50 Years
Packing Method
Flat Pack,Open Top Container,by Steel Skid,etc.
Transport Package
Seaworthy
Specification
By Customized
Origin
Foshan, Guangdong, China.
HS Code
73089000
Model NO.
LXB-37
Type of Steel For Building Structure
High-Strength Steel
Carbon Structural Steel
Q235
Residential Wall Structure
Wall Support
Application
Steel Workshop, Steel Structure Platform, Frame Part, Steel Fence
Raw Materials
Rectangle Tube and Steel Plate
Surface Treatment
Painting & Powder Coat
Life Time of Steel Frame
More Than 50 Years
Packing Method
Flat Pack,Open Top Container,by Steel Skid,etc.
Transport Package
Seaworthy
Specification
By Customized
Origin
Foshan, Guangdong, China.
HS Code
73089000
Fast Install Strong Steel Structure Fence Iron RailingFast Install Strong Steel Structure Fence Iron RailingFast Install Strong Steel Structure Fence Iron Railing
This kind of steel security fence and iron rail have very long life time, more than 50 years . Grouped by strong rectangular tube and 3mm steel plate. All steel column of steel fence will include steel clip,client just use bolt to connect the steel plate and steel clip will be ok . Easy to install and reassembly. Long life time steel fence can be cyclic utilization,and rent to other clients for many times and earn many profit .

Steel fence and railing widely used for project site,road, house, garden,school,hosipital and so on,the steel materials are square tube, rectangular tube, round tube,steel plate and steel wire. The surface treatment is by power coat,good at resist rusty.

And steel fence and railing will be fixed on ground by plug bolt normally, easy and fast installation . All steel parts are finish welding in our factory and some parts will be connctect by bolt at porject site .


Steel structure office building  fabrication process:

1. Prepair raw materials : cut steel plate or use internation size H section steel and angle steel,round tube,round steel,square tube etc.;

2. Assembly and welding: our welders will follow the drawings to assembe the steel members and weld them together as a entire beam/column/brace and so on; (Our quality inspector will check the steel pieces after finish welding,this is the first quality check)

3. Sand blast : After finish welding and polishiing,our sand blast effect can reach internation 2.5 high grade,very good for resist rust; (Secondary quality check)

4.Paint : Within 2 hours after sand blast,all the steel members should be paint. Client can choose any color and any brand of paint. (The third quality check)

5. Inspect the goods by client : After we finish a part of fabrication work,we will invite clients to check the goods before we pack the steel frame.

6.Packing and loading : If clients require us to load the goods by close containers,we will pack the steel structure members one by one on the steel skid and tie the whole steel package well. (The fourth quality check )


Please check the details drawings as follow :

Fast Install Strong Steel Structure Fence Iron Railing
Our strong points(advantages) :

1.  Sand blast:  The sand blast effect reach 2.5 high grade,many countries with high standard requirements accept 2.5 grade.

2.  Welding:        Our welders are full of experiences,professional in butt weld,fillet weld,intermittent welding etc.The welding lines are straight,orderly and nice.

3.  Painting:       We use hight pressure airless spraying machine for painting,both the color and the thickness of paint are well-proportioned.

4.  Packing:  (1)  Open top container(advantage:easy to load the steel;disadvantage:high shipping cost,aleak and few quantity);
                        (2)  Closed container with steel skid (advantage:save shipping cost,all members be packed together and reduce friction,the surface of steel members will be much better;save labor cost to unload the steel members).
Economic type (about US $30-$50/m2)Mian steel frameSpan 5-8m (unrestricted width and length),less than 7 meters high,column and beam:square tube and C purlin (Q195/Q235)
Cladding materialSingle layer steel sheet/EPS panel/brick wall(supplied by client at site)
Doorsandwich panel silding door /single door
Window PVC window
UsuageSimple workshop,warehouse,garage,shading light shed,interim steel building etc.
Suitable areaAfrica,Southeast Asia,Middle East,UAE,Australia and other countries with low wind speed and no snow.
Standard type (about US $45-$100/m2)Mian steel frameSpan 10-30 m (unrestricted width and length),less than 20 meters high (column and beam:H section steel or welded by steel plate)
Roof and wall panelEPS panel/glass wood/rock wool/polyurethane/Mgo/concrete panel/brick wall(supplied by client at site)
Doorsilding door /single door/roller shutter door
Window PVC / Aluminium window
Usuageworkshop,warehouse,garage,shading light shed,shopping mall,office building,showroom,simple hotel etc.
Suitable areaAfrica,Southeast Asia,Middle East,UAE,Australia,South America,Canada etc.
CraneWith or without (1 - 50 tons)
Lage span and high strength type (about US $60-$150/m2)Mian steel frameSpan 30-80 m (unrestricted width and length),less than 12 meters high (column and beam: welded by steel plate Q345)
Roof and wall panelEPS panel/glass wood/rock wool/polyurethane/Mgo/concrete panel/brick wall(supplied by client at site)
Doorsilding door /single door/roller shutter door
Window PVC / Aluminium window
Usuageworkshop,warehouse,garage,shading light shed,shopping mall,office building,showroom,simple hotel etc.
Suitable areaAfrica,Southeast Asia,Middle East,UAE,Australia,South America,Canada etc.
CraneWith or without (1 - 50 tons)
Fireproof type ( about  US $60-$150/m2)Mian steel frameUnrestricted width,length,height and span
Roof and wall panelRock wool panel(50mm to 150mm thickness,density:60kg/m3 - 150kg/m3) or rock wool mgo panel 
DoorFire proof door
Usuageworkshop,warehouse,garage,shopping mall,office building,showroom,hotel etc.
Suitable areaAfrica,Southeast Asia,Middle East,UAE,Australia,South America,Canada and other countries with high requirement for firepooof .
CraneWith or without (1 - 50 tons)
PaintFireproof paint
Heat insulation type (about US $60-$150/m2)Mian steel frameUnrestricted width,length,height and span
Roof and wall panelPolyurethane panel(50mm to 200mm thickness,density: 35kg/m3 - 45kg/m3) or rock wool mgo panel 
DoorPolyurethane door or hear insulation door
Usuagecoolroom,fresh-keeping cold storage,workshop,warehouse,garage,shopping mall,office building,showroom,hotel etc.
Suitable areaRussia,Canada,Northern Europe and other countries with low temperature and high requirement for heat insulation .
CraneWith or without (1 - 50 tons)