China DN 150 C25 C30 C40 Ductile Cast Iron Pipe, Find details about China Ductil Iron Pipe Lock Joint, Nigeria Ductile Iron Pipes from DN 150 C25 C30 C40 Ductile Cast Iron Pipe
Name | Ductile iron water supply pipe |
Material | C, Si, Mn, P, S, Mg |
Length | 6m or customized |
Color | Black |
Advantage | Anti-corrosion; Various types; Anti-infiltration; Anti-aging; Good duralbility |
Processing | pitch coated outside, Cement mortar lining |
1.Standard:ISO2531,EN545,EN598,ANSI/AWWA,C151/A21
2.Effective Length:6m/5.7m
3.Internal Lining :Ordinary Portland Cement ,Sulphate resistant cement ,High-aluminal Cement.
4.External coating:Zinc Primer Plus Bitumen or Expoxy Paiting
5. Shipment: By bulk ship or 20'/40' containr
6. Rubber: NBR, SBR, EPDM according to ISO4633/EN681.1
DN(mm) | DE(mm) | THICKNESS OF WALL(mm) | WEIGHT OF SOCKET(kg) | TOTAL WEIGHT(kg) | ||||
K8 | K9 | K10 | 3.4 | K8 | K9 | K10 | ||
80 | 98 | 6.0 | 6.0 | 6.0 | 4.3 | 77.0 | 77.0 | 77.0 |
100 | 118 | 6.0 | 6.0 | 6.0 | 5.7 | 93.7 | 95.0 | 95.0 |
125 | 144 | 6.0 | 6.0 | 6.0 | 7.1 | 119.0 | 119.0 | 121.0 |
150 | 170 | 6.0 | 6.O | 6.0 | 10.3 | 138.0 | 144.0 | 144.0 |
200 | 222 | 6.0 | 6.3 | 6.4 | 18.9 | 183.0 | 194.0 | 194.0 |
300 | 326 | 6.4 | 7.2 | 8.0 | 23.7 | 290.0 | 323.0 | 357.0 |
350 | 378 | 6.8 | 7.7 | 8.5 | 29.5 | 359.0 | 403.0 | 441.0 |
400 | 429 | 7,2 | 8.1 | 9.0 | 38.3 | 433.0 | 482.0 | 532.0 |
450 | 480 | 7.6 | 8.6 | 9.5 | 42.8 | 515.0 | 577.0 | 632.0 |
500 | 532 | 8.0 | 9.0 | 10.0 | 59.3 | 600.0 | 669.0 | 736.0 |
600 | 635 | 8.8 | 9.9 | 11.0 | 79.1 | 791.0 | 882.0 | 971.0 |
700 | 738 | 9.6 | 10.8 | 12.0 | 102.6 | 1009.0 | 1123.0 | 1237.0 |
800 | 842 | 10.4 | 11.7 | 13.0 | 129 | 1255.0 | 1394.0 | 1537.0 |
900 | 945 | 11.2 | 12.6 | 14.0 | 161.3 | 1521.0 | 1690.0 | 1863.0 |
1000 | 1048 | 12.0 | 13.5 | 15.0 | 237.7 | 1811.0 | 2017.0 | 2221.0 |
Packing and shipping
1.Export sea worthy package + water proof paper + wooden pallet
2.Max Loading 26.5mt for each 20Gp container
3.Safe loading and fixing Professional teams
4.Professional shipping line
Delivery:5-7 days after confirming the order or according to your order quantity
Port of shipment:shanghai
Remark: Insurance is all risk and accept the third party test.
Q1: Are you trading company or manufacturer ?