Injection Mould/Plastic Mould/Washing Machine Mold&Injection Washing Machine Cover/Washer Injection Molded Parts

China Injection Mould/Plastic Mould/Washing Machine Mold&Injection Washing Machine Cover/Washer Injection Molded Parts, Find details about China Plastic Mould, Injection Washing Machine Cover from Injection Mould/Plastic Mould/Washing Machine Mold&Injection Washing Machine Cover/Washer Injection Molded Parts

Model NO.
HRD-177
First Trial Time
30~45 Days After Mould Structure Drawing Confirmed
Shaping Mode
Injection Mould
Surface Finish Process
Polishing
Mould Cavity
Single Cavity
Plastic Material
ABS
Runner
Hot Runner
Design Software
Ug
Installation
Fixed
Standard
Hasco
Customized
Customized
Process Combination Type
Injection Mould
Trademark
HRD
Transport Package
Wood Case
Specification
ISO9001: 2008
Origin
Qingdao, Shandong Province
Model NO.
HRD-177
First Trial Time
30~45 Days After Mould Structure Drawing Confirmed
Shaping Mode
Injection Mould
Surface Finish Process
Polishing
Mould Cavity
Single Cavity
Plastic Material
ABS
Runner
Hot Runner
Design Software
Ug
Installation
Fixed
Standard
Hasco
Customized
Customized
Process Combination Type
Injection Mould
Trademark
HRD
Transport Package
Wood Case
Specification
ISO9001: 2008
Origin
Qingdao, Shandong Province
Key words: Washer mould, Washing machine mould, Laundry machine mould, Washer-drier mould, Twotub washing machine mould, Impeller type washing machine mould, Automatic washing machine mould, Full auto washing machine mould, Rolling washer mould
PLASTIC PARTS:
Injection Mould/Plastic Mould/Washing Machine Mold&Injection Washing Machine Cover/Washer Injection Molded Parts

Injection Mould/Plastic Mould/Washing Machine Mold&Injection Washing Machine Cover/Washer Injection Molded Parts
Relevant products: Moulds for washing machine bucket bottom, washing machine cover, washing machine barrel, washer chassis parts, washing machine dehydration bucket, washing machine control panel
Mould material: 2738, NAK80, 718, 738H, 2344, S136, SKD11 etc.
INJECTION MOULD:
Injection Mould/Plastic Mould/Washing Machine Mold&Injection Washing Machine Cover/Washer Injection Molded Parts
 Mould base: LKM, HASCO, STIEHL etc.
Cavity: Single/Multiple
Runner: Cold/Hot runner (Yudo, Mastip, Mold master, Synventive etc. )
Drawing format: Igs, . Step, . X_t, . Pdf, . Dwg, . Dxf,
Plastic material: ABS, PA, PA66, PA6+GF, PC, PE, PP, PMMA, PS etc.
Mould life: 100, 000 to 3, 000, 000 shots
First trial time: 30~45 days after mould structure drawing confirmed
ISO9001: 2008 certified by SGS.

The first trial success rate is above 95%
{Quotation time}: We will quote in 24 hours after receiving the customer's drawings.
{Data needed to offer}: 2D/ 3D drawing or samples
{Quotation}: Including the accurate price/stage/life and process time.
{The profile}: 2D/3D drawing or samples
{Project Manager}: Concentrate on project tracking and after service
{Engineer}: 30-50 excellent engineers, have many years experience and English communicate well.
{Warehousing and logistics}: The purchase department use EPR system to make sure buying materials in time.
{Fitter technician}: 100-130 experienced workers can meet the customer request of batch production.
{Quality department}: 15 members quality control workers, measuring the mould and parts by CMM and projector.
{Domestic delivery}: Logistics transportation
{Delivery to overseas}: FOB/CIF/DDU by sea shipping or air shipping
 
FitterQuality testing
First die by the fitter for a thorough inspection of the mold as follows:Die ring balance? Tap hole and the nozzle threaded holeare concentric rings, and there is no interference?
 Core spray anti rust agent, thimble ejection is smooth, mould parts are complete, the slider is smooth, faucet installation       The slider, the top block, fixed, dynamic model is Water Leakage? (0.5-1.5Mpa*5 minutes to keep)
According to the customer request is equipped with the factory.Water, oil flow, no residual iron, remains in the mold cooling water, gas removal
 Ensure the mold factory 100% acceptance (including:assembly, test mode etc.)Travel or stop switch is installed? Mold plate is installed?
Die appearance: water mark, mark, mark rings hole templateare complete; the surface rust are clean, then coated withanti rust oil, wooden packing.Mandril reset is smooth, set out is smooth, no blocking, no abnormal sound; slide block moves smoothly?
With mold factory data and CD etc.Oil cylinder action normal? Template, reference angle,water, oil, gas path identification and numbering, ejecting hole is in accordance with the requirements of injection molding machine?
 The positioning ring compliance requirements? Rubbersleeve ball R is consistent with the injection molding machine?
 The support legs refuse nail is installed, and highlyconsistent? Support column is higher than the mold foot?Locking device is installed?
 If the exhaust slot? Hot runner wiring shall be binding, with plate cover, to prevent the assembly pressure off the wire,hot runner heating wiring is correct, reliable and so

Injection Mould/Plastic Mould/Washing Machine Mold&Injection Washing Machine Cover/Washer Injection Molded Parts
Injection Mould/Plastic Mould/Washing Machine Mold&Injection Washing Machine Cover/Washer Injection Molded Parts
Injection Mould/Plastic Mould/Washing Machine Mold&Injection Washing Machine Cover/Washer Injection Molded Parts