Plastic Injection Mold of Building Blocks Toy for Kids

China Plastic Injection Mold of Building Blocks Toy for Kids, Find details about China Lego, Plastic Mould from Plastic Injection Mold of Building Blocks Toy for Kids

Model NO.
GV-005
Runner
Cold Runner
Design Software
Ug/PRO-E/Autocad
Installation
Fixed
Certification
ISO
Standard
HASCO
Customized
Customized
Trademark
OEM
Transport Package
Wooden Case
Specification
TBD
Origin
China
HS Code
8480790090
Model NO.
GV-005
Runner
Cold Runner
Design Software
Ug/PRO-E/Autocad
Installation
Fixed
Certification
ISO
Standard
HASCO
Customized
Customized
Trademark
OEM
Transport Package
Wooden Case
Specification
TBD
Origin
China
HS Code
8480790090
Plastic  injection mold of building blocks toy for kids

Plastic Injection Mold of Building Blocks Toy for Kids



1. ADVANTAGE:

1) Saving 10%-30% cost than others.
2) Direct factory price
3) Life: 3,000,000~5,000,000 shots
4) 2D and 3D provided
5) Quick T1 time: 20-35 days
6) More than 20 years experience

2.PICTURES

Plastic Injection Mold of Building Blocks Toy for Kids
Plastic Injection Mold of Building Blocks Toy for Kids
Plastic Injection Mold of Building Blocks Toy for Kids
Plastic Injection Mold of Building Blocks Toy for Kids



3. MOULD DESCRIPTION:
Mold TypePlastic injection mold, Overmolding, Blowing mould, Extrusion mould, Absorbing-plastics mould,Die-casting mould, Rubber/silicone mould
Design softwareUG, ProE, Auto CAD, Solidworks, etc.
Main servicesPrototypes, Mold design, Mold making, Mold tesing, low volume/ high volume plastic production
CertificateISO 9001:2008
Mould base material:P20, 45#, 4CR13 etc.
Core&Cavity materialS136,718,2378,2316,4CR13,S50C, P20 etc.
Plastic production Raw materialPP,PA6,PLA,AS,ABS,PE,PC,POM,PVC, PET,PS,TPE/TPR etc
Mold baseHASCO ,DME ,LKM,JLS standard
Mold runnerCold runner, hot runner
Mold hot runnerDME, HASCO, YUDO,etc
Mold cold runnerpoint way, side way, follow way, direct gate way,etc.
Mold strandard partsDME, HASCO, etc.
mold life>3,000,000 shots
Mold hot treatmentquencher, nitridation, tempering,etc.
Mold cooling systemwater cooling or Beryllium bronze cooling, etc.
Mold surfaceEDM, texture, high gloss polishing
Hardness of the steel20~60 HRC
EquipmentsHigh speed CNC, standard CNC, EDM, Wire cutting, Grinder,Lathe, Milling machine, plastic injection machine
Lead time25~60 days
Month Production35 sets/month
Packagewooden case
 
4. MOULD MANUFACTURE PROCESS:
1) Cap mould: grinding→fly-cutter →CNC Milling→drilling→lathe→boring lathe→electric pulse →fine fly-cutter→polish→electroplate→install

2) Preform Mould: grinding→drilling→lathe→boring lathe→fine fly-cutter→electroplate→install

5. AFTER SALE SERVICE:
Any mould problem without artificial damage, we will provide free maintenance service.



6. Packaging Details:
(1) assembling and clearing mold well, and then paint anti-rust fog or grease on mold, then cover with thin film and place it into a stable wooden case.
(2)wrapping each part up with semi-transparent thin foam and put it into plastic bag
(3)putting them into cartons with thin sponge plates to prevent scratches.