Bottle Warming and Cooling Machine (PLJ)

China Bottle Warming and Cooling Machine (PLJ), Find details about China Filling Machine, Beverage Machine from Bottle Warming and Cooling Machine (PLJ)

Model NO.
PLJ
Control
PLC
State
New
Certificate
ISO9001
Quality
High
Automatic
Full Automatic
Trademark
Beyond
Transport Package
Export standard packages
Specification
ISO9001/CE/SGS
Origin
China, zhangjiagang
HS Code
8422309010
Model NO.
PLJ
Control
PLC
State
New
Certificate
ISO9001
Quality
High
Automatic
Full Automatic
Trademark
Beyond
Transport Package
Export standard packages
Specification
ISO9001/CE/SGS
Origin
China, zhangjiagang
HS Code
8422309010
Bottle Warming/Cooling Machine (PLJ)

Characters as below:

It is suitable for cooling and heating for all kinds of bottled or canned hot canned hot beverage and carbonated beverage.

The machine reduce the temperature of hot filling drinks to 36-40, or increase the temperature of cold filling carbonic acid drinks to 36 -- 40.

It is used in PE bottled hot tea drinks and carbonic acid drinks cold filling production line. The machine can eliminate the condensed water on the external side of bottles, keep bottle clean and dry.

It makes bottles easier for labeling and packing. Productivity: 5000-20000B/H, spray time about 15-20 minutes.

 
ModelWB-1WB-2
Production Capability(b/m)80-150250-400
Highest sterilization temperature)Max 100Max 100
Surface speed of conveyer belt(mm/min)110-553200-1000
Circular water volume(m³/h)1525
Pressure of steam main pipe (Mpa)0.40.4
Overall dimension(L×W×H)(mm)12000×1914×170014000×2900×1700
Service Term
1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
 
While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days  . The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
 
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges  air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.
 
2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.

Commercial Terms
1. Warranty
All parts are under two Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.
 
2. Payment
30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sight
 
 

Bottle Warming and Cooling Machine (PLJ)
Bottle Warming and Cooling Machine (PLJ)