China EPS Sandwich Panel-Light Weight Wall Board-Fiber Cement Board, Find details about China Sandwich Panel, Fiber Cement Panel from EPS Sandwich Panel-Light Weight Wall Board-Fiber Cement Board
Standard | Thickness (mm) | Length (mm) | Width (mm) | Reference weight (kg/m2) | Application | Products tolerance |
50series | 50 | 2440 | 610 | 40 | For toilet wall (Roofing with steel structure) | Length ±5mm Width±2mm Thickness±1mm flatness±2mm |
75series | 75 | 2440/ 3000 | 58 | Inside wall for building | ||
100series | 100 | 70 | ||||
125series | 125 | 80 | ||||
150series | 150 | 2440 | 90 | |||
Product name | Thaibeck sandwich board system (125mm) | General masonry system (180mm ) |
Raw material | Double faced calcium silicate board , light weight aggregate concrete , cement ,wood fiber & quartz for core body | Normal cement, sandstone ,cinders |
Environmental | Green environmental product | Not |
Waterproof & moistureproof | No deformation no layering in wet area, & easy for waterproof processing. | Need do more waterproofing treatments. |
Soundproof | 50dB | ≤38dB |
Fireproof | 240Min | 180Min |
Hanging heavy weight performance | Single hanging site of the expansion bolt is no than 45kg,Can fixing basin, sanitary fittings and air conditioner, etc. | Single-point hanging force is poorer. |
Characteristics | 1.Environmental protection, fireproof, soundproof, thermal insulation, enlarging the using area. 2.Reasonable price with good quality, Light weight, It can decrease the related building cost. 3.Good characteristic of moisture-proof and can used in humid area. 4.Has smooth surface, No need to more to scrape before the final decoration. Easy to cutting & slotting. 5.Can decorated by any means on the surface, including the ceramic, marble etc. 6.Can be easy to nailed and hanged(the single hanging force is more than 45kg),So it is convenient installation and shorting the working period. | 1.It is a kind of tradition installation method , which is stick by cement and mortar. 2.It can not arranged and installed freely as it is limited by the beam and pillar. 3.Its installation will be in long time and the site will be very dirty with some rubbish. 4.It will be over load as the construction will support over itself. |