China G80 U. S. Type a-345 Forged Master Link Assembly Chain Sling Use, Find details about China G80 Master Link Assembly, Master Link Assembly for Heavy Industry from G80 U. S. Type a-345 Forged Master Link Assembly Chain Sling Use
The Master Link Assembly consists of a main ring, two or more sub-rings, in which the main ring is fully forged, the sub-ring is welded, and the material is Alloy steel. The specification is 1-100 tons,and the safety factor is 4 times.
It is mainly used to assemble the spreader. The sub-ring is connected with the Link Chain and thechain connection, and is assembled into a synthetic rigging for lifting heavy objects and equipment.
It can be used for machinery,industries.
The product has passed the environmental management system certification, and can handlethe product certification of well-known classification societies such as CCS, LR, DNV, etc.
The product has high strength, light weight, exquisite design, strong versatility, diverse functions, and convenient safety inspection
TECHNICAL PARAMETERS
A-345 master link assembly breaking load (4XWLL) | ||||||||
specification | Inside length | Inside width | diameter | WLL(T) | Weight(KG) | |||
3/4 | 140 | 85 | 70 | 40 | 20 | 14 | 4.2 | 1.67 |
7/8 | 160 | 85 | 95 | 40 | 22 | 14 | 5.3 | 2.2 |
1 | 178 | 100 | 89 | 60 | 25 | 18 | 8 | 3.29 |
1-1/4 | 220 | 100 | 110 | 60 | 32 | 22 | 14 | 6.3 |
1-1/2 | 267 | 180 | 135 | 100 | 38 | 30 | 21.2 | 13.7 |
1-3/4 | 305 | 180 | 152 | 100 | 45 | 32 | 30 | 21.25 |
2 | 356 | 180 | 178 | 100 | 50 | 38 | 39.4 | 30.34 |
2-1/4 | 406 | 180 | 203 | 100 | 57 | 45 | 45 | 39.87 |
2-1/2 | 406 | 355 | 203 | 178 | 64 | 50 | 55.5 | 64.4 |
2-3/4 | 406 | 406 | 241 | 203 | 70 | 57 | 63 | 89 |
3 | 457 | 406 | 228 | 203 | 76 | 64 | 70 | 112.14 |
Usually packed in plastic bags, and then in export carton, high quality pallets ;Delivery Detail: Usually 25-30 working days after receiving your advance payment.Bulk packing
Packed in wooden cases
Packed in paper boxes, then in pallets
Delivery Detail:
Usually 25 days after receiving your advance payment.
FAQ
1.Are your manufacturer or Trading Company?
First rigging is professional manufacturer, more than 20 years experience.
2. What products do you supply?
1) Lifting link chain, Coal Mining chain
2) Round Master link
3) Other related products
3.What is your lead time?
Usually 25-30 working days after receiving your advance payment.
4. How do I receive the goods ?
FOB, CFR, CIF are most commonly used trade terms.
5.How do I pay?
TT(Telegraphic Transfer),30% payment in advance, 70% balance
before shipment.