Prefab Mobile Dormitory Units for Workforce Lodging

China Prefab Mobile Dormitory Units for Workforce Lodging, Find details about China Prefabricated Labor Hutments, Labour Accommodation from Prefab Mobile Dormitory Units for Workforce Lodging

Model NO.
KH-PH
Wall Panel
EPS/Rockwool/PU Sandwich Panel
Color
Light Silver Gray or White or Customerized
Door
Steel Door/Sandwich Panel Door
Connection
Screws, Bolts
Trademark
K-HOME
Transport Package
Load Into Sea Container
Origin
Henan, China
HS Code
9406000090
Model NO.
KH-PH
Wall Panel
EPS/Rockwool/PU Sandwich Panel
Color
Light Silver Gray or White or Customerized
Door
Steel Door/Sandwich Panel Door
Connection
Screws, Bolts
Trademark
K-HOME
Transport Package
Load Into Sea Container
Origin
Henan, China
HS Code
9406000090
Prefab Mobile Dormitory Units for Workforce Lodging

This product is no stranger to everyone, you might see it from a remote site, or crowded downtown.
It is mostly used for a temporary construction sites, or temporary offices, etc.

Prefab Mobile Dormitory Units for Workforce Lodging
The Prefab Mobile Dormitory Units for Workforce Lodging is made of light steel as steel structure and sandwich panels
for wall and roof.
The insulation of the sandwich panel can be polystyrene, polyurethane, rock wool and fiber glass.
As a standardized construction product, it has below main features: No construction garbage caused; Environment protective materials adopted, repeated use and low cost; Flexible size and easy to assemble and disassemble with elegant appearance;
Safe and durable. It is suitable for temporary buildings such as dormitory, canteen, recreation room, washing room, etc...



Prefab Mobile Dormitory Units for Workforce Lodging


Technical Parameter of standard Prefabricated Building:

1. Wind resistance: Grade 11(wind speed≤111.5km/h)
2. Earthquake resistance: Grade 7
3. Live load capacity of roofing: 0.5kn/m2
3. External and internal wall heat transmission coefficient: 0.35Kcal/m2hc
4. First floor load capacity: 150 kg/m2
5. Live load of corridor is 2.0kn/ m2
6. Four skilled workers can finish installation of 100sqm in 8 hours for the light steel structure.
7. Most components of the house are recycled, so the shelf life is over 20 years without any building garbage.
8. We can design and produce the house according to customer's request.
9. We can provide the service of installation, supervision and training by extra.


Prefab Mobile Dormitory Units for Workforce LodgingPrefab Mobile Dormitory Units for Workforce Lodging
Prefab Mobile Dormitory Units for Workforce Lodging
Prefab Mobile Dormitory Units for Workforce LodgingPrefab Mobile Dormitory Units for Workforce Lodging
Prefab Mobile Dormitory Units for Workforce Lodging


· Self-built prefabricated engineering houses are used as dormitories with no more than 2 floors. The appearance of the dormitory requires a blue roof, white walls, blue stairs, and blue doors and windows.
·The dormitory doors and windows are made of plastic steel or aluminum with broken bridges, and the door and window frames are blue.
·There should be a guide sign on the wall or entrance of the house indicating the words "dormitory area" or "living area".
·The dormitory should ensure that there is necessary living space, the per capita use area is not less than 2.5 square meters, the indoor clearance height is not less than 2.5m, the channel width is not less than 0.9m, and the number of occupants in each dormitory should not exceed 8.
·The fire control of the dormitory area must strictly meet the relevant regulations.


Prefab Mobile Dormitory Units for Workforce Lodging
Canteen on site

·The distance between the canteen and the toilets, warehouses and other rooms is not less than 15 meters, and it should not be set on the leeward side of the pollution source.
·The canteen should be a single-layer structure, and the ceiling should be suspended. The materials used in the decoration of the canteen must meet the requirements of environmental protection and fire protection.
·The canteen must be equipped with a washing tank, a disinfection tank, a cleaning tank, and a grease trap, and the grease trap must be dug regularly.


Prefab Mobile Dormitory Units for Workforce Lodging
Prefabricated house shower room

·A sufficient number of showers should be installed in the shower room, the ratio of showers to employees should be 1:20, and the shower spacing should not be less than 1 meter.
·The shower room should be equipped with clothes hooks, clothes hangers or wardrobes.
·The floor of the shower room should be made of non-slip tiles.

Prefab house toilet room

·The size of the toilet room should be determined according to the number of workers on the construction site.
·The toilet must have flushing facilities, the floor of the toilet should be covered with non-slip tiles, doors and windows should be complete, and measures should be taken to prevent mosquitoes and flies in summer.
·The setting of toilet seats should meet the requirements of a squatting pan for every 20 people in men's toilets, a squatting pan for every 10 people in women's toilets, and a 1-meter long urinal trough for every 50 people in men's toilets.
·The distance between squatting pans should not be less than 0.9 meters, partitions should be set between squatting positions, and the height of partitions should not be less than 0.9 meters.


Prefab Mobile Dormitory Units for Workforce Lodging

Prefab Mobile Dormitory Units for Workforce LodgingPrefab Mobile Dormitory Units for Workforce Lodging

FAQ?
Q1. What products do you offer? 
A1. We focus on prefabricated houses, such as labor camp, container house, steel structure warehouse, modular villa for more than 12years. 

Q2. What is your payment term? 
A2. Our payment term: For standard products 30% deposite, the banlance should be paid before delivery. For Customized products, will depend on the design. 

Q3. What is your MOQ (minimum order quantity)? 
A3. For standard products, we don't have MOQ quantity. 

Q4. How is your after-sales service? 
A4.1. 24 hours available after-sales service. 
2. For the installation, we will offer installation drawing and videos, if any questions we can reply in time. We can also can send our engineer to guide local workers, but you have to charge the double ticket, accommodation, food and salary. 

Q5. What information should we offer before you quote? 
A5.1. You have the drawing, pls give us and tell us the material you use. 
2. If no drawing, pls tell us the usage and the size of the house, then we design for you with the good price.