China Sandwich Panels Container or Prefab House for Hotel Villa Shop Warehouse Carport Office, Find details about China Prefab House, Flat Pack House from Sandwich Panels Container or Prefab House for Hotel Villa Shop Warehouse Carport Office
Assembly container room | |||
Floor | Mgo board, waterproof, fireproof (fiber cement optional) | ||
Floor finishes | 1.8mm PVC floor (extra) | ||
Roof | Frame structure | 2.3mm thick section steel | |
Cover | 0.426mm Steel sheet | ||
Insulation | Glass wool | ||
Ceiling | 0.25mm steel plate bottom brick | ||
Angle column | 4.5 cold rolled steel sections, galvanized, welded (160mm * 160mm) | ||
wallboard | 50mm rock wool sandwich board | ||
Window | 925mm * 1200mm aluminum alloy window (3mm single glass) | ||
Door | Steel door size 925mm * 2035mm | ||
Electric Power | Lights, switches, sockets, distribution boxes, circuit breakers and wires | ||
Paint | Automatic galvanizing and baking paint spray forming | ||
Frame Dimension | 5950(L)*3000(W)*2800(H) | ||
Bottom | Frame structure | 2.5mm thick section steel | |
We can discuss with customer for more request |
Shipment and Delivery:
FAQ
1. How long is the delivery time?
The delivery time is from 10days to 60 days after getting deposit. It depends on the size of container house.
2. How long is the warranty period?
We will supply free spare parts if any problem occurred in 12 months after installations.
3. Is your company foreign trade company or manufacturer?
We are factory and trading company.
4. Can you supply sample?
Small parts can be supplied, but clients should pay the express fee.
5. Can your company supply container house design?
Our company can give greenhouse design according to your land and plant after getting deposit. And we can give simple drawing before signing contract.
6. How to install Container house?
We will send our engineers to client's site for guiding the installations.
Client should hire enough local workers for doing the installation work.
7. When installing, what cost should we pay?
Our engineers' airline tickets, local accommodations, visa fees, etc are taken by the clients.
8. What is the payment terms?
Generally, our payment way is 30%-50% TT deposit, the balance by TT before loading.
Or you can give your own payment term, then we can negotiate it.