Modular Home Prefab House for Labor Dormitory

China Modular Home Prefab House for Labor Dormitory, Find details about China Mobile House, Portable House from Modular Home Prefab House for Labor Dormitory

Model NO.
ST-0054
Floor
One Floor or Multy Floors
Thickness
50mm,75mm,100mm
Color
Red, White, Blue or as Your Request
Trademark
stewart
Transport Package
According to Customer Requirements
Specification
Any size
Origin
China
HS Code
940600090
Model NO.
ST-0054
Floor
One Floor or Multy Floors
Thickness
50mm,75mm,100mm
Color
Red, White, Blue or as Your Request
Trademark
stewart
Transport Package
According to Customer Requirements
Specification
Any size
Origin
China
HS Code
940600090
Fast install living light steel Prefab house worker dormtories

Advantage:
High quake-proof, water proof and fire proof, High space efficiency

Easy to install and maintenance
Fast construction, save time and labor cost.
Prefabricated and customized design
Nice appearance
Light weight, high strength, 50years durable use, no construction waste.
Easy move, materials can be recycled used, environmentally;
Used as factory, warehouse, office building, aircraft hangar etc;
Structural durabilities, low maintenance.


Product Description:
 
No.Part nameMaterial nameDescription 
1ground channelC shape steelC80x40x15x2.0 
2columnDouble C shape steel2C80x40x15x2.0 welded 
3Beam for second floorSteel frame2C80x40x15x2.0   L40x4 welded 
4Sub-beam for second floorC shape steelC80x40x15x2.0 
5Purlin for roofCorner steelL40x4 
6Bracing for roofCorner steelL40x4 
7Bracing for aisle and rain shelterC shape steelC80x40x15x2.0 welded 
8Bracing between the columnsRound steel boltφ8 
9Step boardSteel boardt=3.0mm 
10stairSteel stairs  
11Wall panelV950 EPS sandwich panel50mm thickness steel plate:0.3mm 
12Patition panelV950 EPS sandwich pannel50mm thickness, steel plate:0.3mm 
 
13Roof panelV950 EPS sandwich pannel50mm thickness,steel plate: 0.3mm 
14Floor for second storeyplywood16mm thickness 
15Rain shelterOne layer color steel plate0.45mm thickness 
16windowsPVC sliding windows0.93mx1.715m 
17doorSandwich panel door0.85mx2.1m 
18intensive and common bolt Different dimension

Modular Home Prefab House for Labor Dormitory


Project :

Modular Home Prefab House for Labor Dormitory



Modular Home Prefab House for Labor Dormitory


Modular Home Prefab House for Labor Dormitory


This style of pre-fabricated house  is widely used because of its low cost and convinience, which can be built as living home, admin office, dorm, classroom, hospital, hall , showroom or other usage as your request.
1)  Light steel structure framework
2)  Wall panels and roof panels are insulated steel sandwich panels.
3)  Doors, windows and interior partitions can be flexibly fixed
4)  Easy to assemble and disassemble for several times without damage
5)  Cost saving and transportation convenient


Company Profile:
Modular Home Prefab House for Labor Dormitory

PACKING&SHIPPING
All the structure components, panels, bolts and sorts of accessories will be well packed with standard package suitable for ocean transport and loaded into 40'HQ.
All the products are loaded at the loading site of our factory using crane and forklift by our skilled workers, who will prevent the goods to be damaged.
Good relationship with many vessel companies to make sure the transportation smooth.
Modular Home Prefab House for Labor Dormitory

OUR SERVICE
1) Quotation send to you according to your drawing.
2) Engineer with rich experience design drawing according to client's requirement.
3) We offer whole building for client, such as design, manufacture, and installation.
 
*Pre-sale service
1. Customized drawing designing free of charge
2. Professional advice according the site conditions
3. Settle transportation affair
 
*Construction stage
1. Supply you with detailed construction drawing to guide
2. Send one engineer to your local
3. Provide related production for your reference
 
*After-sale service
1. Reasonable advice for usage, maintenance, technically improve
2. Unique engineer be in charge of your project
3. On-site service         

FAQ
1. How to buy your idea products?
A: TT and L/C are acceptable and TT will be more appreciated. 50% deposit before producing, balance before loading by TT.
 
2.What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 15 to 30 days.
 
3. How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
 
4.How to install after the goods arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.