200 M Bore Well Truck Mounted Water Well Drilling Rig Contractors Perforador Horizontal

China 200 M Bore Well Truck Mounted Water Well Drilling Rig Contractors Perforador Horizontal, Find details about China 200 M Drilling Rig, Best Water Well Drilling Rig from 200 M Bore Well Truck Mounted Water Well Drilling Rig Contractors Perforador Horizontal

Model NO.
JK-DR 200X
Drill Hole Depth
200m
Bit Type
Diamond Bit
Drilling Way
Rotary
Type
Crawler
Power Type
Diesel
Usage
Water Well
Voltage
24 V
Weight
4.7 T
Trademark
SDJK
Transport Package
20gp
Specification
4000*1700*2200mm
Origin
Shang Dong
HS Code
8430412100
Model NO.
JK-DR 200X
Drill Hole Depth
200m
Bit Type
Diamond Bit
Drilling Way
Rotary
Type
Crawler
Power Type
Diesel
Usage
Water Well
Voltage
24 V
Weight
4.7 T
Trademark
SDJK
Transport Package
20gp
Specification
4000*1700*2200mm
Origin
Shang Dong
HS Code
8430412100
Package size per unit product
3950.00cm * 1700.00cm * 2300.00cm
Gross weight per unit product
5000.000kg
JK-DR 200X Steel Crawler Water Well Drilling Rig 

 
Model & NameJK-DR200X
Weight  5000 kg
Dimensions(mm)3950*1700*2300mm
Power OilDiesel
Engine ModelQUANCHAI
Rated Power65 kW
Travelling SystemRubber Crawler
Drilling depth  200m
Bore diameter 140-350mm
Drive Head Stroke3.4m
Travelling speed2.5km/h
Gradeability30%
Rated pressure1.7-3.0 MPa
Air consumption17-30 m³/min
Drill rod diameter Φ76,Φ89mm
Drill rod length 1.5m, 2.0m, 3.0m
Elevating capacity 13Ton
Swing speed 45-65rpm
Swing torque   3500-4700 N.m


1. The engine uses QUANCHAI 65KWturbocharged engine;
2. Walking travel: crawler mounted ,trailer mounted for choice.
3. Hydraulic oil pump:Parallel gearbox design separates the oil pump unit, the power supply is adequately distributed, the hydraulic system is uniquely designed, and the maintenance cost is small;
4.Power head device:gearbox integrated casting, dual motor power, large torque, durable, low maintenance costs;
5.Drilling machine chassis:professional digging chassis, durable, heavy bearing, wide chain plate, less damage to hard roads;
6.Lifting force:design composite tower, 3.4m long stroke, double cylinder lift capacity 13 ton
7. Each rig is equipped with a relief valve to raise the boom to protect the cylinder and ensure work safety;
8. Each hydraulic oil pipe is covered with a protective jacket to make the oil pipe last longer.