ASTM A53/106/179/192/213/335 P11 P22 P5 P9 Cold Finished Seamless Steel Boiler Tube

China ASTM A53/106/179/192/213/335 P11 P22 P5 P9 Cold Finished Seamless Steel Boiler Tube, Find details about China Boiler Tube, Heat Exchanger Tube from ASTM A53/106/179/192/213/335 P11 P22 P5 P9 Cold Finished Seamless Steel Boiler Tube

Model NO.
EZS
Usage
Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose
Section Shape
Round
Product
Seamless Hot Rolled A106 B Carbon Steel Pipe
Standard
API 5L/ASTM A106/ASTM A53
Grade
a, B, C, X42, X46, X52, X60 etc
Delivery Time
20days(as Per Request)
Pipe End
Plain End/Bevel End/Threaded End
Category1
Construction, Liquid Service, Machinery
Category2
Low and Medium Pressure Boiler, High Pressure
Category3
Heat Exchangers and Condensers
Length
Random Length Fixed Length Customer Requirements
Inspection
Third Party Inspection(BV, SGS, TUV etc)
Type of Pipe
Seamless Pipe
Customize
Available
Tolerance
Acording to The Standard
Mill Test
Ut, Et, Hydraulic Test
Shipment Method
Container, LCL Cargo, Break Bulk Vessel
Trademark
EZS
Transport Package
Bundled with Plastic Caps
Specification
12-1016mm
Origin
China
HS Code
7304
Model NO.
EZS
Usage
Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose
Section Shape
Round
Product
Seamless Hot Rolled A106 B Carbon Steel Pipe
Standard
API 5L/ASTM A106/ASTM A53
Grade
a, B, C, X42, X46, X52, X60 etc
Delivery Time
20days(as Per Request)
Pipe End
Plain End/Bevel End/Threaded End
Category1
Construction, Liquid Service, Machinery
Category2
Low and Medium Pressure Boiler, High Pressure
Category3
Heat Exchangers and Condensers
Length
Random Length Fixed Length Customer Requirements
Inspection
Third Party Inspection(BV, SGS, TUV etc)
Type of Pipe
Seamless Pipe
Customize
Available
Tolerance
Acording to The Standard
Mill Test
Ut, Et, Hydraulic Test
Shipment Method
Container, LCL Cargo, Break Bulk Vessel
Trademark
EZS
Transport Package
Bundled with Plastic Caps
Specification
12-1016mm
Origin
China
HS Code
7304
Product nameASTM A179/192/213/335 En10216-2 Bs5039 P235G P11 P22 P5 P9 Cold Finished Seamless Steel Tubing
Standard & GradeASTM A53/API 5L/A106 Grade B/DIN 17175
ST35.8/SA179/SA192/DIN10216/JIS G3441
SizeOD: 12mm-1016mm
WT: 1.5-100mm
LengthRandom length
Fixed length
As per request
Pipe endPlain end
Beveled end with caps
Customer requirements
PackingWooden boxes/plastic wrapping or as per request
Delivery time20-30days, as per requirements
Payment termT/T L/C D/P
CategorySeamless steel pipe for building construction
Seamless steel pipe for liquid service, petroleum & natural gas storage, water, oil transport
Seamless steel pipe for machinery
Seamless steel pipe for high, low and medium pressure boiler
Seamless steel pipe for electric power station
Seamless steel pipe for heat exchangers and condensers
Seamless steel pipe for oil well and coupling material
Seamless steel pipe for automobile axle sleeve and automobile fittings
Others

ASTM A53/106/179/192/213/335 P11 P22 P5 P9 Cold Finished Seamless Steel Boiler Tube
ASTM A53/106/179/192/213/335 P11 P22 P5 P9 Cold Finished Seamless Steel Boiler Tube
ASTM A53/106/179/192/213/335 P11 P22 P5 P9 Cold Finished Seamless Steel Boiler Tube
ASTM A53/106/179/192/213/335 P11 P22 P5 P9 Cold Finished Seamless Steel Boiler Tube
ASTM A53/106/179/192/213/335 P11 P22 P5 P9 Cold Finished Seamless Steel Boiler Tube
ASTM A53/106/179/192/213/335 P11 P22 P5 P9 Cold Finished Seamless Steel Boiler Tube
ASTM A53/106/179/192/213/335 P11 P22 P5 P9 Cold Finished Seamless Steel Boiler Tube
ASTM A53/106/179/192/213/335 P11 P22 P5 P9 Cold Finished Seamless Steel Boiler TubeASTM A53/106/179/192/213/335 P11 P22 P5 P9 Cold Finished Seamless Steel Boiler TubeASTM A53/106/179/192/213/335 P11 P22 P5 P9 Cold Finished Seamless Steel Boiler Tube
ASTM A53/106/179/192/213/335 P11 P22 P5 P9 Cold Finished Seamless Steel Boiler Tube

FAQ

Q:  How many days can you deliver after confirmed the order?
A:  For stock:  within 5-7 days;
      For customized product:  around 30 days;
      For special sizes:  subject to negotiation.

Q: How does your company do quality control?
A: ISO 9001:2015 certified;
     Product certificate as per EN10204 3.1 or 3.2 as per customer's request.
    
Q: Can I have a factory-visit?
A:  Surely. All customers are welcome to visit us in China.

Q: Can I have a trial order?
A: Of course, it is an honor for us to have the opportunity to show our quality and service. 



EZ STEEL INDUSTRIAL CO.,LTD