Drilling Rig Excavator Crane Steel Crawler

China Drilling Rig Excavator Crane Steel Crawler, Find details about China Crawler Undercarriage, Steel Crawler from Drilling Rig Excavator Crane Steel Crawler

Model NO.
Steel Crawler, Steel Track, Crawler Undercarriage
Delivery Time
15 Days
Related Models
Steel Crawler, Rubber Crawler
Track Type
Steel Track/Rubber Track
Standard
8ton,10ton,12ton,15ton,20ton,25ton,30ton,35ton
Travel Speed
30km/H
Climbing Ability
30 Degrees
Trademark
BOLIN
Transport Package
Export Standard Packing
Specification
Steel Crawler Undercarriage Group
Origin
China
HS Code
8431499900
Model NO.
Steel Crawler, Steel Track, Crawler Undercarriage
Delivery Time
15 Days
Related Models
Steel Crawler, Rubber Crawler
Track Type
Steel Track/Rubber Track
Standard
8ton,10ton,12ton,15ton,20ton,25ton,30ton,35ton
Travel Speed
30km/H
Climbing Ability
30 Degrees
Trademark
BOLIN
Transport Package
Export Standard Packing
Specification
Steel Crawler Undercarriage Group
Origin
China
HS Code
8431499900

BOLIN Machinery--Professional Crawler Undercarriage Assembly Manufacturer

Self-designed Crawler Chassis by Our Own R&D Team.

Factory Direct Sales, Stable Quality with Best Price!!!
Drilling Rig Excavator Crane Steel Crawler
Features:
Model::Customized Steel Crawler Undercarriage Assembly Crawler Chassis Steel Crawler With Motor Crawler With Final Drive Hydraulic Crawler Chassis Assy Group
Material:The beam is made of Q345B with high loading capacity.
Design:Self-Designed, also can be designed and manufactured on customers' request.
Application:Drilling rig, Excavator, Road Paver, Crawler Crane, Pile Driver, Aerial Working Platform and Construction Engineering Machines.
Capacity:0.5 ton - 150 ton
Delivery Time:Within 7 days
Quality Warranty:12 months
Drilling Rig Excavator Crane Steel Crawler
Track systems can be choosed multi-functionally.

Depending on the required load and capacities, you can choose a track system with rubber tracks, a track system with steel tracks or a track system with interchangeable tracks, so that you can switch between rubber and steel.
The common features of all track systems are the low soil pressure, the 360° turning possibility and the excellent cross-country manoeuvrability.
 
Drilling Rig Excavator Crane Steel Crawler
Steel/ Rubber Crawler Track Undercarriage Assy 0.5ton - 50tons

Widely used for Drilling Rig, Crawler Crane, Crusher, Excavator, Screener, Forest & Logging, Materialhandling, Pipelayer, Harvesting Machine, Lifting Machine, Dumper, Road Paver, Pile Driver, Lawn Mawer, Tractor, Vehicle Crane, Truck, Farm Loader, Agricultural Machine/Farm Machine.
Drilling Rig Excavator Crane Steel Crawler
We can supply the whole track undercarriage system including hydraulic parts, bearing bracket, gear - box etc. as customer required.Drilling Rig Excavator Crane Steel Crawler

Specifications of crawler tracked undercarriage:
 

TypeParameters(mm)Track VarietiesLoading Capacity(Kg)
LengthCenter DistanceTotal WidthWidth of TrackHeight
BOL0.5R1200900900150300Rubber track500
BOL0.8R1240940900180300Rubber track800
BOL1.0R138010801000180320Rubber track1000
BOL1.5R155012401000200350Rubber track1300-1500
BOL2.0R185014901300250400Rubber track1500-2000
BOL2.5R193015701300250450Rubber track2000-2500
BOL3.0R203015001600300480Rubber track3000-4000
BOL3.0S189515001700300485Steel track3000-4000
BOL4.0R216616361750300520Rubber track4000-5000
BOL4.0S199016001800300530Steel track4000-5000
BOL5.0R225017201800300535Rubber track5000-6000
BOL5.0S211815911800300550Steel track5000-6000
BOL7.0R281222821850350580Rubber track6000-7000
BOL700S279522651800350600Steel track6000-7000
BOL8.0R288023501850400580Rubber track7000-8000
BOL8.0S288023501850400600Steel track7000-8000
BOL10R350032022200400650Rubber track9000-10000
BOL10S350032022200400670Steel track9000-10000
BOL15R380038022200500700Rubber track13000-15000
BOL15S380038022200400700Steel track13000-15000
BOL20S380533002200500720Steel track18000-20000
BOL25S413934002200500730Steel track22000-25000
BOL35S400032802200500750Steel track30000-40000
BOL45S400033002200500830Steel track40000-50000
BOL60S450038002200500950Steel track50000-60000
BOL80S5000430023006001000Steel track80000-90000
BOL100S5500480023006001100Steel track100000-110000
BOL120S5500480024007001200Steel track120000-130000
BOL150S6000530024009001400Steel track140000-150000

Packed by Standard Exporting Packing
Wooden Pallet, Wooden Case, Steel Frame Packing are for choosing.
Drilling Rig Excavator Crane Steel Crawler

FAQ :

1. Are you the manufacturer or trader?

We are the manufacturer with more than 20 years experience engaged in designing and manufacturing of steel crawler undercarriage.

2. How long is the delivery?

Usually it is 20 days for the production of steel crawler undercarriage.

3. What's the warranty of your product?

We can offer you 12 months quality guarantee period after receipt of steel crawler undercarriage.

4. Can you custom make the product?

Yes, all dimensions and specifications can be designed and made based on your requirements.

5. How to order?

To make sure the offered steel crawler undercarriage is suitable for your application, please offer the following details:

1. Rubber or steel track undercarriage:  
2. What is the payload of undercarriage:
Note: it is the weight of machine excluding the weight of undercarriage.
3. length of track undercarriage (mm):
4. width of each side of track undercarriage (mm):
5. height of track undercarriage (mm):
6. total width of track undercarriage (mm):
7. working flow rate per each side of undercarriage (L/min):
8. working pressure (MPa):

9. travelling speed (km/hr):
10. climbing capacity:

Drilling Rig Excavator Crane Steel Crawler
Strict Quality Control

Drilling Rig Excavator Crane Steel Crawler
Contact Us:
rDrilling Rig Excavator Crane Steel Crawler
Freda Wang
----------------
Sales Manager



SHANDONG BOLIN MACHINERY CO., LTD.
Add: Lingong Road, Linyi City, Shandong Province, China
  
Mobile: +86 150 6592 9360