China Hydro Generator Manufacturer Electricity Generator 100kw
Hydro Generator Manufacturer Electricity Generator 100KW - 1500KW
Turgo turbine is one of impulse turbine, applicable water head 30 to 300 meter. The center of jet flow with runner gyration plane angled 22.5°. the water flow contracted by the spray nozzle , flows entering one side of runner and comes out from other side.
Horizontal unit has the advantages of simple structure,convenient repair,reduce the plant height,advantages in reducing excavation depth.
The vertical unit with plant plane size small,a runner can be provided with a plurality of nozzles,(at most can be installed six nozzles),high specific speed,the same size as units of capacity is relatively small,light weight and so on.
Working Principle
When water flows from the pressure foray into the turbine nozzle through pipe, its potential energy is converted to kinetic energy by the nozzle. The high speed water jet comes out from the nozzle strikes at the buckets (blades) at a certain angle (not in a tangential direction) against the rotating surface of the runner. The water flows into the propeller (turbine runner) from one side and flows out from other side.
In a Turgo, the runner is less expensive to make than a Pelton Wheel and does not need an airtight housing like the Francis. It also has a higher specific speed, handling a greater flow than the Pelton Wheel. This leads to a reduced generator and installation cost. Turgos operate in a head range where the Francis and Pelton overlap.
Pelton Hydro Turbine Product Features
1.suitable for high head,small flow and flow changes in large runoff hydropower station.
2.With the power plant investment is small,compact units structure characteristics.
3.Has the efficiency changes smoothly,operating a wide range,even in the 15--20% load is reduced efficiency.
4.Suitable for high head,small flow station in mountainous area.
5.A unit construction,simple restrictions without cavitation condition,the advantages of stable operation,less investment,construction area.
Pelton Hydro Turbine Product Parameters:
Pelton tubine generator unit | Generator | Unit output (kw) | |||||
Turbine | |||||||
Type | Water head(m) | Discharge (m³/s) | Output(kw) | Speed (r/min) | Type | Capacity (kw) | |
CJA237/475-1*7 | 200 | 0.232 | 383.2 | 750 | SFW320-8/850 | 320 | 358.3 |
220 | 0.243 | 440.5 | SFW400-8/850 | 400 | 414.1 | ||
240 | 0.254 | 502 | SFW500-8/850 | 500 | 474.4 | ||
260 | 0.264 | 572 | 1000 | SFW500-6/850 | 500 | 540.5 | |
280 | 0.274 | 643.5 | SFW630-6/990 | 630 | 608.1 | ||
300 | 0.284 | 714.6 | SFW630-6/990 | 630 | 675.3 | ||
CJA237/475-W-90/1*4.5 | 275 | 0.086 | 176.3 | 750 | SFW160-8/650 | 160 | 162.9 |
300 | 0.0896 | 200.4 | SFW200-8/740 | 200 | 185.8 | ||
325 | 0.0932 | 225.8 | SFW200-8/740 | 200 | 209.3 | ||
350 | 0.0969 | 252.8 | SFW250-8/740 | 250 | 235.1 | ||
375 | 0.1005 | 279.8 | SFW250-8/740 | 250 | 260.2 | ||
400 | 0.103 | 309 | 1000 | SFW250-8/740 | 250 | 287.4 | |
425 | 0.1077 | 341.3 | SFW320-6/740 | 320 | 320.1 | ||
450 | 0.1098 | 368.4 | SFW320-6/740 | 320 | 345.5 | ||
500 | 0.119 | 496 | SFW500-6/850 | 500 | 456 | ||
600 | 0.131 | 650 | SFW630-6/990 | 630 | 610 | ||
700 | 0.141 | 823 | SFW800-6/990 | 800 | 770 | ||
CJA237/475-W-90/1*7 | 260 | 0.261 | 572 | 750 | SFW500-8/850 | 500 | 526 |
280 | 0.271 | 636 | SFW630-8/990 | 630 | 585 | ||
300 | 0.28 | 700 | SFW630-8/990 | 630 | 651 | ||
320 | 0.289 | 766 | SFW800-8/990 | 800 | 712 | ||
340 | 0.298 | 834 | SFW800-8/990 | 800 | 775 | ||
360 | 0.307 | 899 | SFW800-8/990 | 800 | 836 | ||
380 | 0.315 | 968 | SFW1000-8/1180 | 1000 | 900 | ||
400 | 0.327 | 1093 | 1000 | SFW1000-6/1180 | 1000 | 1021.9 | |
420 | 0.335 | 1159 | SFW1000-6/1180 | 1000 | 1189 | ||
440 | 0.343 | 1287 | SFW1250-6/1180 | 1250 | 1203.3 | ||
460 | 0.351 | 1382 | SFW1250-6/1180 | 1250 | 1292.2 | ||
480 | 0.359 | 1476 | SFW1250-6/1180 | 1250 | 1380.1 | ||
500 | 0.366 | 1567 | SFW1600-6/1180 | 1600 | 1465. |
Company Information
Our workshop
FAQ
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need, voltage, on grid or off grid operation,
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment,upgrade, improvement, repair,refurbishment of turbines,generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, What is an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7,Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website.
website address: cdforster.en.made-in-china.com