China Bioevopeak -86 Degree Ultra-Low Temperature Freezer Dual Refrigeration System Lab Medical Freezer Vaccine Freezer, Find details about China Vaccine Freezer, Freezer -86 from Bioevopeak -86 Degree Ultra-Low Temperature Freezer Dual Refrigeration System Lab Medical Freezer Vaccine Freezer
Key Design Features
Model | ULF86-410P | ULF86-590P | ULF86-730P | ULF86-840P | |
Specifications | Shelf/drawer QTY | Stainless steel shelf/3 | Stainless steel shelf/3 | Stainless steel shelf/3 | Stainless steel shelf/3 |
Cooling | Direct cooling | Direct cooling | Direct cooling | Direct cooling | |
Defrost | Manual | Manual | Manual | Manual | |
Refrigerant | Mixed-gas | Mixed-gas | Mixed-gas | Mixed-gas | |
Power Consumption(kWh/24h) | 14.5 | 16.5 | 18.8 | ||
Noise(db) | 53 | 53 | 53 | 55 | |
Ambient temperature(ºC) | 10~32ºC | 10~32ºC | 10~32ºC | 10~32ºC | |
Temperature range(ºC) | -40~-86ºC | -40~-86ºC | -40~-86ºC | -40~-86ºC | |
Cooling system | Compressor brand/QTY | SECOP/2 | SECOP/2 | SECOP/2 | SECOP/2 |
Sensor | PTC | PTC | PTC | PTC | |
Temperature controller | Microprocessor | Microprocessor | Microprocessor | Microprocessor | |
Display | LCD display | LCD display | LCD display | LCD display | |
Power | Voltage/frequency(V/Hz) | 220/50Hz | 220/50Hz | 220/50Hz | 220/50Hz |
Power(W) | 1350W | 1500W | 1700W | ||
Current(A) | 8A | 9.1A | 9.8A | ||
Material | Inside material | 304 Stainless steel | 304 Stainless steel | 304 Stainless steel | 304 Stainless steel |
Outside material | Color sprayed steel | Color sprayed steel | Color sprayed steel | Color sprayed steel | |
Insulation | PURF | PURF | PURF | PURF | |
Size | Capacity(L/cu.ft) | 408 | 588 | 728 | 838 |
NT./GT.(kg) | 255/307 | 297.5/358.5 | 360/401.5 | 336.5/416 | |
Exterior size(W*D*H)(mm) | 900*940*1940 | 885*1100*1995 | 1260*890*2010 | 1190*1045*2010 | |
Interior size(W*D*H)(mm) | 606*575*1180 | 606*738*1310 | 963*558*1350 | 894*718*1310 | |
Package size(W*D*H)(mm) | 955*960*2100 | 970*1140*2190 | 1320*970*2190 | 1270*1105*2220 | |
CBM | 1.93 | 2.42 | 2.8 | 3.12 | |
20GP/40GP/40HQ | 12/24/24 | 12/24/24 | 2.8 | 8/18/18 | |
Frozen Racks | Racks | 16(5X4,4X4) | 16(5X5) | 8/18/18 | 24(5X5) |
Boxes (2 Inches) | 288 | 400 | 504 | 600 | |
Samples(2ml) | 28800 | 40000 | 50400 | 60000 | |
Alarm | High/low temperature | Y | Y | Y | Y |
Power failure | Y | Y | Y | Y | |
Abnormal voltage | Y | Y | Y | Y | |
Sensor error | Y | Y | Y | Y | |
Filter screen check | Y | Y | Y | Y | |
Thermostat failure | Y | Y | Y | Y | |
Low battery | Y | Y | Y | Y | |
Condenser clean | Y | Y | Y | Y | |
High ambient temperature | Y | Y | Y | Y | |
Door ajar | Y | Y | Y | Y | |
Power failure backup system(alarm) | 72h | 72h | 73h | 72h | |
Accessories | Castor | Y | Y | Y | Y |
Inside door | 2 | 2 | 2 | 2 | |
Test hole QTY/diameter | 1/25MM | 1/25MM | 1/25MM | 1/25MM | |
USB port | Y | Y | Y | Y | |
Chart recorder | / | / | / | / | |
Data logger | Optional | Optional | Optional | Optional | |
Remote alarm port | Y | Y | Y | Y | |
Optional | CO2 back up system | Optional | Optional | Optional | Optional |
LN2 back up system | Optional | Optional | Optional | Optional |
Single Door Pharmacy Refrigerator -40 Degree Deep Freezer Combination Refrigerator
Q: How about quality of the goods?
A:lAll the running products comply with CE standards.
lIndependent quality inspection team, conducting multiple inspections and random inspections from parts supply to product dispatch.
lWell-known third-party testing service available, such as SGS, BV, and TUV, etc.
Q: What are your pre- and after-sales services?
A:lTimely reply to pre-sales enquiries
lReal-time update of manufacturing and shipment status
lContracted third-party maintenance company in over 60 countries
lAssured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.