Concrete Pump Spare Parts Pipe Twin Wall Elbow DN125 R275

China Concrete Pump Spare Parts Pipe Twin Wall Elbow DN125 R275, Find details about China Pipe Fitting, Construction Machinery from Concrete Pump Spare Parts Pipe Twin Wall Elbow DN125 R275

Model NO.
DN125 R275 90D
Damping Layer
Polymer Damping Layer
Thickness(Back Arc+Arc)
>13+8mm
Hardened Process
UHF Quenching (400kHz)
Theoretical Weight(Lbs/Kg)
36.1/16.4
Flange Tape
Sk148 HD157 Zx175 FM175
Weld Tensile Strength
>580bar
Test Pressure
160bar
Color
Red Black White or Customized
Surface Coating
Baking Paint
Manufacture Process
Pushed/Quenched/Automatic Welding
Trademark
Ximai
Transport Package
Standard Export Package
Specification
DN125 R275 90 degree
Origin
China
HS Code
841391
Model NO.
DN125 R275 90D
Damping Layer
Polymer Damping Layer
Thickness(Back Arc+Arc)
>13+8mm
Hardened Process
UHF Quenching (400kHz)
Theoretical Weight(Lbs/Kg)
36.1/16.4
Flange Tape
Sk148 HD157 Zx175 FM175
Weld Tensile Strength
>580bar
Test Pressure
160bar
Color
Red Black White or Customized
Surface Coating
Baking Paint
Manufacture Process
Pushed/Quenched/Automatic Welding
Trademark
Ximai
Transport Package
Standard Export Package
Specification
DN125 R275 90 degree
Origin
China
HS Code
841391
Product description.............................................................................................
High quality twin wall elbow
                
TWIN WALL ELBOW DN125 R275  90°
CAST CHROME CARBIDE LINER+POLYMER DAMPING LAYER+ST52 SHELL
Part NumberSpecificationWeight
lbs/kgs
Liner HardnessDimension TolerancePressureWeld tensile strengthSurface coating
TWBE527590DN125 R275  90°32.2/14.6Up to 62-65HRC<1mm  
 
<
160bar>580barBaking paint
TWDE527590DN125 R275  90°36.1/16.4Up to 62-65HRC<1mm  
 
<
160bar>580barBaking paint
All boom elbows and deck elbow for PM, SCHWING, CIAF, JUNJIN,KCP etc are available

Advantages

The twin-layer structure ensures high abrasion resistance and toughness

Chromium alloy iron casting enables the liner highly wear proof and reduce pressure

Seamless welding enables the the outer layer hard to explode  

Light weight improves vehicle efficiency, highly reduces labor and cost and the time for replacement

Designed structure, material and process realize its 3-5 times service life of common products

to extend the service life of other pipe fitting

Easy to use and handle


Our service......................................................................................................................
 
High Quality:
ISO9001, CE, CO certifications etc. All components adopt the qualified materials.
100% quality check and durable testing for every product before shipment.

Competitive Price
Large scale production and well trained workers reduce cost greatly,
Ximai use the Bottom Price to make you become the most competitive seller in your region.


One-Stop Shopping
Our major is concrete pump pipe and forged coupling, we also have several partners,
supplying related products so that can meet customers' needs.


Short Lead Time
We have power production capacity, produce 1500 sets couplings and 500pcs pipes every day.
We can have your urgent orders ready in short time.


Standard export package
Our package is in conformity with export requirements.
We ensure it's very safe and firm in the course of shipping.


Customer Service
Top sales with professional skills make you never feel difficult to communicate with a factory,
all Ximai staff will stand by you, reply your inquiry and solve your problem, no matter pre-sales or after-sales.




Production display...........................................................................................

Concrete Pump Spare Parts Pipe Twin Wall Elbow DN125 R275

Concrete Pump Spare Parts Pipe Twin Wall Elbow DN125 R275

Product process............................................................................................................................................................


                     Concrete Pump Spare Parts Pipe Twin Wall Elbow DN125 R275

Product test..........................................................................................................................................................

Concrete Pump Spare Parts Pipe Twin Wall Elbow DN125 R275



Packaging&Shipping.................................................................................................................................................





Concrete Pump Spare Parts Pipe Twin Wall Elbow DN125 R275



Contact us.................................................................................................................................................................

Concrete Pump Spare Parts Pipe Twin Wall Elbow DN125 R275


FAQ......................................................................................................................................

...............................................

Q: Are you trading company or manufacturer ?

A: We are a factory.
 

Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to your quantity.
 

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but the cost of freight by your side.