PE Double-Wall Hollow Winding Pipe Machine (SJ65/33)
Plastic PE double-wall hollow winding pipe machine is increasingly becoming a leading product for urban drainage pipes and it will gradually replace the steel pipes and cement pipes and other plastic pipe.
Plastic PE double-wall hollow winding pipe machine. The large diameter HDPE pipe adopts advanced PLC computer control, double-stage pressure reduction screw and composite head die, of which includes pipe extruder, melt extruder, winding forming machine, cutting machine and relevant auxiliaries. Plastic PE double-wall hollow winding pipe machine. This production line features high capacity, high efficiency and stable running. The finished pipe features high rigidity, high creep-resistance, convenient connection and economic construction.
Plastic PE double-wall hollow winding pipe machine can make the following pipes: Double-wall corrugated winding pipe, double-wall pipe and wall winding pipe and triple winding pipe.
If you want more details about this Extrusion Line, please contact us.
Item of Plastic PE double-wall hollow winding pipe machine | Specification (mm) | Extruder | Total Power (KW)Installed(Actual Consumption 50%) | Max. Output (kg/h) | Overall Dimensions(L*W*H)(m) |
Model | L/D Ratio | Main Motor Power (KW) | Heating Power (KW) |
SKRG800 | Dia200-800 | SJ90 | 30: 1 | 75 | 30 | 230 | 260 | 10× 21.5× 2.6 |
SJ65 | 30: 1 | 45 | 18 |
SKRG1200 | Dia400-1200 | SJ90 | 34: 1 | 110 | 30 | 300 | 500 | 10× 23× 2.7 |
SJ65 | 30: 1 | 75 | 18 |
SKRG1500 | Dia900-1500 | SJ90× 30 | 30: 1 | 110 | 30 | 450 | 600 | 28× 18× 6 |
SJ90× 34 | 34: 1 | 110 | 36 |
SJ65× 30 | 30: 1 | 75 | 18 |
SKRG2200 | Dia1200-2200 | SJ120 | 30: 1 | 185 | 60 | 500 | 700 | 30× 20× 7 |
SJ90 | 34: 1 | 110 | 36 |
SJ65× 30 | 30: 1 | 75 | 18 |
SKRG3000 | Dia2200-3000 | SJ150 | 30: 1 | 280 | 80 | 650 | 800 | 32× 20× 8 |
SJ120 | 30: 1 | 185 | 60 |
TRADE TERMS
Payment Term: 30% for prepayment by T/T, 70% for balanced payment by T/T, or L/C can be acceptable
Delivery Time: 40 days after receipt of prepayment.
Packing Method: Packing film or wooden case
Guaranteed Time: 12 months
MACHINERUNNING TEST AND AFTER SERVICE
When machine finished, we will invited client come to our factory to check the machine and do the machine test. If machine is ok, then client pay for the balance. And inspect machine load the container.
When machine arrives client's factory, if client needs, we will send 1-2 engineer to client's factory do the machine installation and running test, and also train the local worker how to operate and maintain the machine. It is chargeable.
If have any question or problem on machine operation or maintain, welcome to contact to us by email or calling. We stand by 24 hours.