China 10r Automatic High Speed Thread Rolling Machine for Nails, Find details about China Washer Assembly Machine, Self-Drilling Screw from 10r Automatic High Speed Thread Rolling Machine for Nails
Model | Diameter | Screw Length | Moving dies Stationary Highth | Moving dies specification | Main motor | Capacity (pcs/min) | Weight (kg) | Machine Size |
003 Thread Rolling Machine | 0.8-2.6 | 16 | 20 | 45*55*15 | 2 | 350-500 | 420 | 136*90*150 |
004 Thread Rolling Machine | 2-4 | 30 | 25/35 | 65*80*19 | 3 | 300-450 | 500 | 147*114*140 |
4R Thread Rolling Machine | 2-4 | 30 | 40 | 65*75*19 | 3 | 200-280 | 750 | 160*110*150 |
5R Thread Rolling Machine | 3-5 | 50 | 55/65/75 | 76*89*25 | 3 | 170-220 | 1000 | 160*130*165 |
6R Thread Rolling Machine | 3-6 | 50 | 55/80 | 90*105*25 | 5 | 140-180 | 1400 | 190*150*160 |
8R Thread Rolling Machine | 4-8 | 75 | 75/100 | 108*127*25 | 7.5 | 135-165 | 1900 | 200*160*170 |
8R Thread Rolling Machine | 4-8 | 75 | 85/100/125 | 108*127*25 | 7.5 | 120-150 | 2300 | 270*140*170 |
8R Thread Rolling Machine | 4-8 | 100 | 100/150/200 | 127*140*25 | 10 | 90-125 | 3200 | 270*120*190 |
10R Thread Rolling Machine | 6-10 | 100 | 100/150/200 | 150*165*25 | 15 | 80-120 | 3300 | 289*121*218 |
12R Thread Rolling Machine | 8-12 | 100 | 100/150/200 | 190*215*35 | 20 | 65-85 | 5600 | 326*152*234 |
16R Thread Rolling Machine | 12-16 | 150 | 150/200/250 | 230*265*38 | 30 | 45-60 | 6700 | 350*190*220 |
Q: what's the packing of the machine?
A.In wooden pallet, In plastic film, the spare parts and cabinet packed by wooden box.
Q: What's the payment term?
A.Usually by T/T ( 30% in advance, the balance shoud be paid shipping before)
Q: Can I change the motor as my local voltage?
A.We can change the voltage as your requirement, and there's no extra charge.
Q: How do your control quality?
A.W have an inspection team to check the products at all stages of the production process.
Q:What parameter is necessary?
A.The nail diameter, nail length ect are mainly needed, detailed information would be appreciated, Special requirement can be discussed.
Q:How long will it take to deliver goods?
A:We will deliver the goods within 10 days for spare parts, other goods maybe take a little more times to test and prepare, we will deliver the goods within the deadline which both parties agreehainiud.