China Wholesale Plastic AC Cable Electric Plug Vertical Making Machines Supplier, Find details about China 2 Pin Plug Making Machine, Electric Plug Making Machine from Wholesale Plastic AC Cable Electric Plug Vertical Making Machines Supplier
JY-500C/JY-850C Technique specification | ||||||
Model | Units | JY-500C | JY-850C | |||
Injection System | Screw Diameter | mm | Φ32 | Φ38 | Φ40 | Φ45 |
Injection Pressure | Kg/cm2 | 1506 | 1063 | 2396 | 1842 | |
Theoretical Shot volume | cm3 | 153 | 215 | 263 | 318 | |
Max. Shot Weight(P.S) | g/Oz | 139/4.89 | 196/6.9 | 228/8 | 283/10.2 | |
Injection Rate | mm | 190 | 190 | |||
Max.Screw speed | rpm | 0-175 | 0-160 | |||
Temperature Control | ZONE | 4 | 4 | |||
Clamping System | Clamping Force | T | 55 | 85 | ||
Platen Size | mm | 480*280 | 580*330 | |||
Distance Between Tie Bare | mm | 265 | 285 | |||
Min Mold Height | mm | 215/200 | 285/280 | |||
Opening Stroke | mm | 200 | 280 | |||
Max. Open Daylight | mm | 290/215 | 280/30 | |||
Ejector Force | T | 1.5 | 2.2 | |||
Ejector stroke | mm | 135 | 135 | |||
Hydraulic System | Max. Hydraulic Pressure | Kg/cm2 | 140 | 140 | ||
Pump Output | L | 40 | 47 | |||
Pump Motor Power | Kw | 7.5/10HP | 11/15HP | |||
Barrel Heating Power | Kw | 13 | 23 | |||
Total Wattage | Kw | 4.4 | 5.8 | |||
Others | Machine Dimensions (L*W*H) | m | 3*1.2*2.1 | 3.4*1.4*2.5 | ||
Shipping Measurement (L*W*H) | m | 3.1*1.3*2.3 | 3.6*1.5*2.7 | |||
Machine Weight | T | 4.4 | 5.8 | |||
Shipping Weight | T | 5 | 6.5 |
Send me inquiry, We promise to give an additional six month free warranty.
Total 18 months warranty.
Q1: Are you a trading company or a manufacturer? |
A1: Factory we are, all the machine are made by ourselves. Besides, you can get the customize service with your requirements |
Q2: What's your warranty for the machine? |
A2: One Year Warranty(all the machine parts can be replaced within one year free of charge, not including the manmade broke), life-time maintenance. |
Q3: What's your Delivery Time? |
A3: Usually it is 3-5 days if the machine is in stock; If not, the delivery time is 10-25 days according to your required quantity and our busy season. |
Q4: Where is your factory? How can visit you? |
A4: Our factory is next to Guangzhou and Shenzhen. We will drive you to our factory by car when you arrive at Dongguan or Changping Railway(Bus) station. |
Q5: Why choose Jieyang Machinery Co., Ltd.? |
A5: "Customer Satisfaction, Continual Improvement & Innovative Service" are the driving force for our company to moving forwards. We will devote every efforts to do the best level machine and service. |
Welcome to visit our factory to view more details.