China Pn10 Pn16 Carbon Steel Stainless Steel Lug Type Double Disc Dual Plate Wafer Check Valve, Find details about China Valve, Industrial Valve from Pn10 Pn16 Carbon Steel Stainless Steel Lug Type Double Disc Dual Plate Wafer Check Valve
AFC TECH wafer Dual Plate Check Valves designed and manufactured strictly to International Standards
API 6D, API 594, ASME B16.34 or Equivalent.
Standards Compliance and Design Features:
» Design & Manufactured to API 6D, API 594, ASME B16.34 or Equivalent
» P.T Ratings to ASME B16.34
» Face to Face Dimensions to ASME B16.10
» Flanged Ends to ASME B16.5
» Butt-weld Ends to ASME B16.25
» Valves Marking to Valves Marking
» Inspect & Tested to API 598
» Size Ranges from 2" thru 60".
» Structured in One Piece Union Body
» Pressure Ratings from Class 150 to Class 2500, PN16 to PN420
» Ends Connections in Flanged R.F or RTJ, Wafer, Fully Lugged and Grooved
» A variety of body and trim material is offered, including carbon steel ASTM A216 WCB, WCC; Cast or Ductile iron A126, GG25, A536 or GGG50, Low Carbon Steel LCB, LCC, Alloy Steel WC6, WC9, C5, Stainless Steel CF8, CF8M, CF3, CF3M, Duplex & Super Duplex Steel A890 GR.4A,5A or F51, Special Materials in Monel, Alu. Bronze C95800, 95600 , Inconel, Alloy 20 etc. Coatings may be provided for added corrosion or wear resistance. Hard-facing and weld overlays may also be supplied. Seats Options with metal-to-metal or bubble-tight resilient.
» Optional Bypass system & Counter-weight Assembly.
Product Show:
1. Focusing on exporting, more than 80% products are sold worldwide. |
2. Provide Full Sets of Solutions for your various industrial needs. |
3. Strict & Traceable Quality Control System |
4. Simplified & Effective Managing System |
5. Competitive Price & On-time Delivery, with Integrated Services |
Foundry (Castings and forgings)
Quality Control:
Packing and Shipment:
Application:
Valves serve a variety of purposes in the industrial, engineering, manufacturing and scientific communities. Selecting the right valve can determine the success or failure of the system or process.
The main purpose of a valve is to control media flow through a system. The valve may be used to start, stop, or throttle the flow to ensure safe and efficient operation of the process. Valves play a large role in most industries. With high quality and excellent service, AFC TECH valves are widely used Oil & gas industry, refinery & petrochemical industry, off shore, power generation, mining industry, pulp and paper, water treatment etc.
Aftersales Services:
1. For each batch of goods we made, we'll furnish MTC to show the goods are 100% inspected & tested, and qualified to use.
2. Full sets of parts and accessories in the AFC TECH of the technical drawing can be supplied, in case of any possible repair or change.
3. Even our goods are made under strict quality control system, but still can not 100% avoid unexpected conditions or quality problems forever, that's why we furnish a warranty of 18 months from shipment date, during this period, we'll take responsibility for the repair, change or return for free due to quality problems.
FAQ:
1. Q: Are you a manufacturer or a trading company?
A: We are a production and marketing company, industry and trade integration. Our factories are responsible for manufacturing, we are dealing with all exporting business.
2. Q: Do you have any international certificates?
A: Yes, our factories have CE and ISO etc. certificates.
3.Q: Do you have any export experience?
A: Yes, we have been exported a lot worldwide. More than 80% of our products are
for exporting.
4.Q: Do you have any quality certificates?
A: Yes, EN 10204 3.1 Material Certificate will be supplied together with delivery. Certificate of Origin shall be supplied upon client's request
5. Q: Do you have any Non-destructive Test?
A: Yes, we have upon the customer's requests.
6. Q: Can you manufacture valves with our brand?
A: Yes, we can manufacture with our own brand or OEM.
7. Q: Do you have any guarantee?
A: Yes, we warrant our products against defects from faulty manufacturing for 12 months from the initial date of installation, or within 18 months after shipment, subject to whichever to be earlier.