High Quality Cuplock Scaffold Omega Transom

China High Quality Cuplock Scaffold Omega Transom, Find details about China Cuplock Scaffolding, Cuplock Scaffolding Omega Transom from High Quality Cuplock Scaffold Omega Transom

Model NO.
TPCTCSOT003
Erection Position
External Scaffolding
Move Method
Attached Lifting Scaffolding
Scaffolding Part Type
Cuplock Scaffolding
Construction Properties
Installation Scaffold
Item Name
Cuplock Scaffolding Omega Transom
Surface Finish
HDG,Painted,Powder Coated
Length
Various
Color
Silver
Trademark
Everprime Scaffold
Transport Package
Steel Pallet
Specification
2mm, 3mm
Origin
Jiangsu, China
HS Code
73084000
Model NO.
TPCTCSOT003
Erection Position
External Scaffolding
Move Method
Attached Lifting Scaffolding
Scaffolding Part Type
Cuplock Scaffolding
Construction Properties
Installation Scaffold
Item Name
Cuplock Scaffolding Omega Transom
Surface Finish
HDG,Painted,Powder Coated
Length
Various
Color
Silver
Trademark
Everprime Scaffold
Transport Package
Steel Pallet
Specification
2mm, 3mm
Origin
Jiangsu, China
HS Code
73084000

Cuplock scaffolding omega transom
 
1. Cuplock scaffolding omega transom is manufactured with high strength steel,compatible with other cuplock scaffolding parts.
2. The thickness of the material: 2mm or 3mm
3. Length of the omega transom:1.3m,1.8m,etc.
4. Surface finish: hot dip galvanized
5. Package: steel pallet
6. Competitive price and fast delivery







FAQ

1.---What is your product range?
   ---Ringlock system,frame system,tubes and couplers,cuplock system,props,other scaffolding accessories and metal products.

2.---What is MOQ?
   ---Usually we don't have a MOQ,but it depends on the product you are looking for

3.---Can I request samples?Is it free?
   ---Yes,we can offer free samples on most itmes if it is not too heavy or big

4.---Do you offer OEM service?
   ---Yes

5.---How you do the quality control?
   ---Our strict quality control system ensures all products well made step by step. All the raw materials are bought from professional steel manufacturers, with Mill Test Certificates offered. Our quality control persons inspect and monitor the whole process from raw material, cutting, pressing, welding, matching, surface finish, finishing process, packing, container loading and transportation.

6.---Do you have certificate?
   ---Clients need to pay the cost to do the test from Third Party Testing Agent.Factory certificates can be offered for some products.We have testing machines in the factory,and also working with labs for testing.

7.---What is production time?
   ---Usually it takes 25-30 days for the first container,production goes faster after the first container once all raw materials are ready.The more the faster.Partial shipment can be arranged if requested.

8.---What is your payment term?
   ---T/T is prefered.L/C at sight can be accepted in some area.

9.---What is your after-sale service?
   ---All the after-sale problems will be solved based on mutual friendly communication.
       In case of quantity shortage,the detailed certificates should be sent to our side in seven days after the goods arrive at  your warehouse.In case of quality discrepancy,such as problems caused by raw material,welding,or surface finish,the detailed certificates should be sent to our side.If it is confirmed caused by our side for the above two mentioned situations,the loss will be compensated as the new goods sent to your side in next order.