Plastic Injection Parts for Car Part/Large Mold/Complex Mould/Car Tyre Mould/ Second Hand Mould

China Plastic Injection Parts for Car Part/Large Mold/Complex Mould/Car Tyre Mould/Second Hand Mould, Find details about China Bumper Mould, Casting Mould from Plastic Injection Parts for Car Part/Large Mold/Complex Mould/Car Tyre Mould/Second Hand Mould

Model NO.
A0057
Runner
Hot Runner
Design Software
UG
Installation
Fixed
Certification
TS16949, ISO, FDA
Standard
HASCO
Customized
Customized
Gate Type
Valve Gate/Open Gate/Sub Gate/Edge Gate
Mold Steel
Nak80,SKD61
Cycle Time
40s
Cavity
as Per Client′s Requirement
Production Material
as Per Client′s Requirement
Shape
Base on Drawings
Trademark
MYMOULD
Transport Package
Carton
Specification
Customized
Origin
Shanghai, China
HS Code
8480719090
Model NO.
A0057
Runner
Hot Runner
Design Software
UG
Installation
Fixed
Certification
TS16949, ISO, FDA
Standard
HASCO
Customized
Customized
Gate Type
Valve Gate/Open Gate/Sub Gate/Edge Gate
Mold Steel
Nak80,SKD61
Cycle Time
40s
Cavity
as Per Client′s Requirement
Production Material
as Per Client′s Requirement
Shape
Base on Drawings
Trademark
MYMOULD
Transport Package
Carton
Specification
Customized
Origin
Shanghai, China
HS Code
8480719090

Plastic Injection Mould for Car Part/Large Mold/Complex Mould/Car Tyre Mould/Second Hand Mould


 
1. Start from part design analysis.
2. Mold design drawing and DFM report available so you can see how is the mold going to  be before mold making. 
3. If product is complex, moldflow report will be present as well.
4. Indoor workshop ensures you high quality under good control.
5. Normally it takes 15-60 days to make mold, precise time depends on complexity of design.

Mould material

Plastic mould material: P20 steel, 718, 2738,H13, NAK80,1.2344,2343,S136,etc....

Fast mould design

We can be within 1-3 working days after getting customer's drawings.

Lead time

Plastic moulds: 2- 7 weeks after getting the mould design confirmation.

Mould testing

All of the moulds can be well tested before the shipments. Videos testing the moulds are available.

Minimum order

Small orders can be accepted.

Production capacity

45-50 sets/month.

Port

Shanghai

Runner

YUDO runner, hot Runner, cold runner, sub gate/edge gate /cow horn gate…etc

Payment terms

L/C T/T Western Union MoneyGram.

Mould making service

Mould Tool Manufacturing/Plastic Injection Moulding and OEM Services/Rapid Prototyping and 3D Printing/Secondary Operations

After-sales service

Life-long gurantee.

Safe packing

In strong wooden pallets to avoid any damages during long transportation.

Plastic Injection Parts for Car Part/Large Mold/Complex Mould/Car Tyre Mould/Second Hand Mould
Plastic Injection Parts for Car Part/Large Mold/Complex Mould/Car Tyre Mould/Second Hand Mould
Plastic Injection Parts for Car Part/Large Mold/Complex Mould/Car Tyre Mould/Second Hand Mould
Plastic Injection Parts for Car Part/Large Mold/Complex Mould/Car Tyre Mould/Second Hand Mould
Plastic Injection Parts for Car Part/Large Mold/Complex Mould/Car Tyre Mould/Second Hand MouldPlastic Injection Parts for Car Part/Large Mold/Complex Mould/Car Tyre Mould/Second Hand Mould
Plastic Injection Parts for Car Part/Large Mold/Complex Mould/Car Tyre Mould/Second Hand Mould
Plastic Injection Parts for Car Part/Large Mold/Complex Mould/Car Tyre Mould/Second Hand Mould
Plastic Injection Parts for Car Part/Large Mold/Complex Mould/Car Tyre Mould/Second Hand Mould

Plastic Injection Parts for Car Part/Large Mold/Complex Mould/Car Tyre Mould/Second Hand Mould

                     Why Customers Choose Us?
We have been engaged in this field for 15 years, we've served customers from the United States, the United Kingdom, Spain, Australia, Singapore, Russia and other countries.
Professional Certification
Quality control and technology improvement
•ISOIS09001:2000
•SGS certificate
•The complete quality control system.
Precision durable mold
•3 CNC: Precision 0.005mm
•1 Three dimension:1Precision 0.001mm 
•1 wire drive slowly: Precision 0.002mm
•2 Mirror discharge: Precision 0.005mm
100% Guaranteed Quality
•100% tested(Not Just Batch Tested)
•SOP standard production
•IQC(tested all in matical )-IPQC(tested first parts and prodcut)-FQC(tested finished parts)-OQC(Shipments) 
•10 professional quality control inspectors
Competitive price and service
•Delivery time: 2-3 Weeks after order
•Provide new design for customers' requirements
•Provide DFM Report,Moldflow,Mould Design,MPR,QC Report, Injection parameter sheet,Testing video.
•Free provided sample.
•10-20% cheaper than other competitors
•Return the entire mould cost  if you order  500,000pcs  product.
•Life-long guarantee period, which is much longer among this field.