Ied 's Differential Protection and Automatic System of 69kv Line

China Ied′s Differential Protection and Automatic System of 69kv Line, Find details about China Relay, Differential from Ied′s Differential Protection and Automatic System of 69kv Line

Model NO.
SEL311L
Condition
New
Customized
Non-Customized
Trademark
SEL/ABB/SCHNEIDER/CHINA
Transport Package
Carton with Wooden
Specification
6-66KV
Origin
China
Model NO.
SEL311L
Condition
New
Customized
Non-Customized
Trademark
SEL/ABB/SCHNEIDER/CHINA
Transport Package
Carton with Wooden
Specification
6-66KV
Origin
China

Ied′s Differential Protection and Automatic System of 69kv Line

 
  IED´S LINE PROTECTION RELAY69KV 
PROTECTIONS 
QUANTITY2 2
MOUNTING INCLUDING WHERE CNEL EP INDICATE YES
LINE DIFERECIAL87 L87L
DISTANCE FROM LINELESS than 100 km, which the supplier provides if need DIMMERApproximately 100KM
PUTT - POTT-PROTECTION SCHEMEBASED ON ANSI 78ANSI 78
DISTANCE21, MHO AND CUDRILATERAL; OR ONLY QUADRILATERAL21, MHO,QUADRILATERAL
FAULT LOCATOR21 FL, PROGRAMMABLE21 FL, PROGRAMMABLE
OVERCURRENT ( 1 and 2 WINDINGS ));
CURVES ANSI - IEC
50/5150/51
50N/51N50N/51N
5OG / 51G5OG / 51G
DIRECTIONAL67 F, 67 N67 , 67 N
POLARIZATION BY VOLTAGE OR CURRENTVOLTAGE
ADJUSTMENTS OF ANGLESRCA/ROARCA
FAULT FUSEYES, TO BLOCK THE DISTANCE IN CASE OF
LOSS OF VOLTAGE FROM THE PT´S
YES, TO BLOCK THE DISTANCE IN CASE OF
LOSS OF VOLTAGE FROM THE PT´S
HIGH IMPEDANCE FAULTHIGH IMPEDANCE FAULTHIGH IMPEDANCE FAULT
LOW VOLTAGE27; PROGRAMMABLE BY THE USER27; PROGRAMMABLE BY THE USER
OVER VOLTAGE79y PROGRAMMABLE BY THE USER59 PROGRAMMABLE BY THE USER
BREAKER FAILURE50BFYES
PROTOCOLIEEE C37.94IEEEC37.94
MEASUREMENTS 
I dif.Differential currentYES
(I) bar.Current restrainingYES
IPrimary and secondary winding currentYES
CURRENTIYES
VOLTAGEVYES
POWER FACTORFPYES
POWERSACTIVE, REACTIVE AND APPARENTACTIVE, REACTIVE AND APPARENT
KEYPAD OPTION  
OPEN YES
CLOSE YES
TRIGGERTRIPOLARYES
EVENT LOG 
OSCILOGRAFIASPre fails - post failureYES
DATE YES
TIME YES
FAULT CURRENT SEQUENCE +, - AND 0 YES
FAULT SIGNALLINGUSE OF LEDLDC AND LED
INPUTS AND DIGITAL OUTPUTS 
DIGITAL INPUTS6 MINIMUM16
DIGITAL OUTPUTS6 MINIMUM14
CURRENT NOMINAL SECONDARY1-5 AMP1 A  AND 5A
ADJUST TAPLESSER or equal 0.5 InYES
STANDARDSANSI-IECANSI  IEC
POWER SUPPLY 180-240 VDC24 - 48Vdc 1
48 - 110Vdc (40-100Vac)
110 - 250Vdc (100-240Vac)
POWER 280-240 VacNA
PULSES OF VOLTAGEDIGITAL INPUT, DIGITAL OUTPUT60%-80%Uaux
WARRANTY 
10 YEARSMINIMUM2years
TERMINAL TEST - SHORTCIRCUITABLE 
TERMINAL TEST - SHORTCIRCUITABLESHORTCIRCUITABLE TERMINALS AND TESTS SHOULD COME WITH THE INSTALLATION MANUAL IN SPANISH, THE TERMINAL BOARD MUST BE ABLE TO WITHSTAND VALUE OF INJECTION OF SECONDARY CURRENT MINIMUM 100 A. IS ACCEPTED THAT THE TWO TERMINALS COME IN A SINGLE ELEMENT, IN CASE THAT THE PURCHASE INCLUDE BOARD POSITION, TERMINALS MUST BE ALREADY INSTALLED AND READY TO OPERATE. THE PROTECTIONS OF CNEL EP GROUP WILL CARRY OUT INJECTION TESTING ALTOGETHER WITH A TECHNICIAN OF MANUFACTURES OR SERVICEMAN OF THE OFFEROR AND VERIFY THE OPERATION THEREOF IN CONJUNCTION WITH THE PROTECTION RELAY.yes
CERTIFICATES 
CERTIFICATE OF SOLE REPRESENTATIVE AUTHORIZED BRAND IN PROTECTION RELAYSOKYES
CERTIFICATE KEMA IEC 61850-6, 7-1, 7-2, 7-3, 7-4 and 8-1OKYES
CERTIFIED ISO STANDARD 9001OKYES
CERTIFIED NOTARIZED THAT CONSISTS WITH TECHNICAL
IN ECUADOR TO HAVE IMMEDIATE SOLUTIONS.
OKYES
CERTIFIED TRAINING  
TRAINING CERTIFIED IN SPANISH LANGUAGE WITH CERTIFIED INSTRUCTOR FROM FACTORY 
1 training 5 days, after that the OFFEROR is required to give training for a year until they are solvent doubts IED´s. this under prior coordination with the administrator of the contract of CNEL EP, these skills will be two-day minimum 5 times A year, to failure to comply with this shall present its poor compliance for future contracts offered by CNEL EP.
YES but the language is English
2 SUBJECT PROTECTIONS SETTINGS, THE PERSON WHO WILL GIVE THE TRAINING MUST BE PROTECTIONS ENG. AND SHOULD BE IN FULL KNOWLEDGE OF THE SUBJECT, ABLE TO RESOLVE ALL QUESTIONS SUBMITTED AT THAT TIME.YES but the language is English
3. COMMUNICATION TO THE CONTRACT ADMINISTRATORYES but the language is English
4. IEC 61850, WANT TO MAKE AN EXAMPLE
TWO IED´s this should be demonstrated and
IN FULL ACCEPTANCE OF THE GROUP
ASSISTANT TO THE TRAINING.
YES but the language is English
5. EVIDENCE OF CURRENT INJECTION YES but the language is English
6. INSTALLATION ON THE SAME FIELD, IF IT
REQUESTED SEVERAL INSTALL ONE AS EXAMPLE, PART OF THE TRAINING.
YES but the language is English
LICENSEFREE (N NUMBER OF USERS)3
LOCAL TECHNICAL SUPPORTADDRESSES, PHONES, RESPONSIBLE
WITH STAFF TO SUPPORT TECHNICIAN, DOCUMENT NOTARIZED SIGNATURE
Please contact the local Schneider
MANUALSpanishEnglish/Spanish
AMBIENT TEMPERATUREMORE THAN 40 DEGREES, LESS THAN THAN 10-25ºC~+55ºC
COMMUNICATIONS 
PORTS TYPEDESCRIPTION 
FRONTRJ-45, RS 485FOR FIELD CONFIGURATIONDB9 RS232
2 PORTS, REARFIBER OPTICCOMMUNICATION WITH OTHER SEPARDOS GEOGRAPHICALLY SUBSTATION RELAYYES(Optional)
 
2 PORTS, REARETHERNETNETWORK CONFIGURATION WITH REDUNDANCY DOUBLE, INTEGRATION TO THE SCADAYES(The 2nd Ethernet port is optional)
1 PORT DB9-IRIG-BTIME SYNCHRONIZATIONBNC IRIG-B
1 PORT RS-485THE SCADA INTEGRATIONYES
The relay should have all the benefits for the installation of the 87's line, with all the useful fiber ports in connection. 
PROTOCOLSIF 
MODBUS/TCP, DNP3/LAN/WAN, FTP, TELNET, PING, IEC 61850IEC 61850
SERIAL 
DNP3, MODBUS RTU, DNP3,MODBUS RTU,IEC103