China Ied′s Differential Protection and Automatic System of 69kv Line, Find details about China Relay, Differential from Ied′s Differential Protection and Automatic System of 69kv Line
IED´S LINE PROTECTION RELAY | 69KV | ||
PROTECTIONS | |||
QUANTITY | 2 | 2 | |
MOUNTING | INCLUDING WHERE CNEL EP INDICATE | YES | |
LINE DIFERECIAL | 87 L | 87L | |
DISTANCE FROM LINE | LESS than 100 km, which the supplier provides if need DIMMER | Approximately 100KM | |
PUTT - POTT-PROTECTION SCHEME | BASED ON ANSI 78 | ANSI 78 | |
DISTANCE | 21, MHO AND CUDRILATERAL; OR ONLY QUADRILATERAL | 21, MHO,QUADRILATERAL | |
FAULT LOCATOR | 21 FL, PROGRAMMABLE | 21 FL, PROGRAMMABLE | |
OVERCURRENT ( 1 and 2 WINDINGS )); CURVES ANSI - IEC | 50/51 | 50/51 | |
50N/51N | 50N/51N | ||
5OG / 51G | 5OG / 51G | ||
DIRECTIONAL | 67 F, 67 N | 67 , 67 N | |
POLARIZATION | BY VOLTAGE OR CURRENT | VOLTAGE | |
ADJUSTMENTS OF ANGLES | RCA/ROA | RCA | |
FAULT FUSE | YES, TO BLOCK THE DISTANCE IN CASE OF LOSS OF VOLTAGE FROM THE PT´S | YES, TO BLOCK THE DISTANCE IN CASE OF LOSS OF VOLTAGE FROM THE PT´S | |
HIGH IMPEDANCE FAULT | HIGH IMPEDANCE FAULT | HIGH IMPEDANCE FAULT | |
LOW VOLTAGE | 27; PROGRAMMABLE BY THE USER | 27; PROGRAMMABLE BY THE USER | |
OVER VOLTAGE | 79y PROGRAMMABLE BY THE USER | 59 PROGRAMMABLE BY THE USER | |
BREAKER FAILURE | 50BF | YES | |
PROTOCOL | IEEE C37.94 | IEEEC37.94 | |
MEASUREMENTS | |||
I dif. | Differential current | YES | |
(I) bar. | Current restraining | YES | |
I | Primary and secondary winding current | YES | |
CURRENT | I | YES | |
VOLTAGE | V | YES | |
POWER FACTOR | FP | YES | |
POWERS | ACTIVE, REACTIVE AND APPARENT | ACTIVE, REACTIVE AND APPARENT | |
KEYPAD OPTION | |||
OPEN | YES | ||
CLOSE | YES | ||
TRIGGER | TRIPOLAR | YES | |
EVENT LOG | |||
OSCILOGRAFIAS | Pre fails - post failure | YES | |
DATE | YES | ||
TIME | YES | ||
FAULT CURRENT SEQUENCE +, - AND 0 | YES | ||
FAULT SIGNALLING | USE OF LED | LDC AND LED | |
INPUTS AND DIGITAL OUTPUTS | |||
DIGITAL INPUTS | 6 MINIMUM | 16 | |
DIGITAL OUTPUTS | 6 MINIMUM | 14 | |
CURRENT NOMINAL SECONDARY | 1-5 AMP | 1 A AND 5A | |
ADJUST TAP | LESSER or equal 0.5 In | YES | |
STANDARDS | ANSI-IEC | ANSI IEC | |
POWER SUPPLY 1 | 80-240 VDC | 24 - 48Vdc 1 48 - 110Vdc (40-100Vac) 110 - 250Vdc (100-240Vac) | |
POWER 2 | 80-240 Vac | NA | |
PULSES OF VOLTAGE | DIGITAL INPUT, DIGITAL OUTPUT | 60%-80%Uaux | |
WARRANTY | |||
10 YEARS | MINIMUM | 2years | |
TERMINAL TEST - SHORTCIRCUITABLE | |||
TERMINAL TEST - SHORTCIRCUITABLE | SHORTCIRCUITABLE TERMINALS AND TESTS SHOULD COME WITH THE INSTALLATION MANUAL IN SPANISH, THE TERMINAL BOARD MUST BE ABLE TO WITHSTAND VALUE OF INJECTION OF SECONDARY CURRENT MINIMUM 100 A. IS ACCEPTED THAT THE TWO TERMINALS COME IN A SINGLE ELEMENT, IN CASE THAT THE PURCHASE INCLUDE BOARD POSITION, TERMINALS MUST BE ALREADY INSTALLED AND READY TO OPERATE. THE PROTECTIONS OF CNEL EP GROUP WILL CARRY OUT INJECTION TESTING ALTOGETHER WITH A TECHNICIAN OF MANUFACTURES OR SERVICEMAN OF THE OFFEROR AND VERIFY THE OPERATION THEREOF IN CONJUNCTION WITH THE PROTECTION RELAY. | yes | |
CERTIFICATES | |||
CERTIFICATE OF SOLE REPRESENTATIVE AUTHORIZED BRAND IN PROTECTION RELAYS | OK | YES | |
CERTIFICATE KEMA IEC 61850-6, 7-1, 7-2, 7-3, 7-4 and 8-1 | OK | YES | |
CERTIFIED ISO STANDARD 9001 | OK | YES | |
CERTIFIED NOTARIZED THAT CONSISTS WITH TECHNICAL IN ECUADOR TO HAVE IMMEDIATE SOLUTIONS. | OK | YES | |
CERTIFIED TRAINING | |||
TRAINING CERTIFIED IN SPANISH LANGUAGE WITH CERTIFIED INSTRUCTOR FROM FACTORY | 1 training 5 days, after that the OFFEROR is required to give training for a year until they are solvent doubts IED´s. this under prior coordination with the administrator of the contract of CNEL EP, these skills will be two-day minimum 5 times A year, to failure to comply with this shall present its poor compliance for future contracts offered by CNEL EP. | YES but the language is English | |
2 SUBJECT PROTECTIONS SETTINGS, THE PERSON WHO WILL GIVE THE TRAINING MUST BE PROTECTIONS ENG. AND SHOULD BE IN FULL KNOWLEDGE OF THE SUBJECT, ABLE TO RESOLVE ALL QUESTIONS SUBMITTED AT THAT TIME. | YES but the language is English | ||
3. COMMUNICATION TO THE CONTRACT ADMINISTRATOR | YES but the language is English | ||
4. IEC 61850, WANT TO MAKE AN EXAMPLE TWO IED´s this should be demonstrated and IN FULL ACCEPTANCE OF THE GROUP ASSISTANT TO THE TRAINING. | YES but the language is English | ||
5. EVIDENCE OF CURRENT INJECTION | YES but the language is English | ||
6. INSTALLATION ON THE SAME FIELD, IF IT REQUESTED SEVERAL INSTALL ONE AS EXAMPLE, PART OF THE TRAINING. | YES but the language is English | ||
LICENSE | FREE (N NUMBER OF USERS) | 3 | |
LOCAL TECHNICAL SUPPORT | ADDRESSES, PHONES, RESPONSIBLE WITH STAFF TO SUPPORT TECHNICIAN, DOCUMENT NOTARIZED SIGNATURE | Please contact the local Schneider | |
MANUAL | Spanish | English/Spanish | |
AMBIENT TEMPERATURE | MORE THAN 40 DEGREES, LESS THAN THAN 10 | -25ºC~+55ºC | |
COMMUNICATIONS | |||
PORTS | TYPE | DESCRIPTION | |
FRONT | RJ-45, RS 485 | FOR FIELD CONFIGURATION | DB9 RS232 |
2 PORTS, REAR | FIBER OPTIC | COMMUNICATION WITH OTHER SEPARDOS GEOGRAPHICALLY SUBSTATION RELAY | YES(Optional) |
2 PORTS, REAR | ETHERNET | NETWORK CONFIGURATION WITH REDUNDANCY DOUBLE, INTEGRATION TO THE SCADA | YES(The 2nd Ethernet port is optional) |
1 PORT | DB9-IRIG-B | TIME SYNCHRONIZATION | BNC IRIG-B |
1 PORT | RS-485 | THE SCADA INTEGRATION | YES |
The relay should have all the benefits for the installation of the 87's line, with all the useful fiber ports in connection. | |||
PROTOCOLS | IF | ||
MODBUS/TCP, DNP3/LAN/WAN, FTP, TELNET, PING, IEC 61850 | IEC 61850 | ||
SERIAL | |||
DNP3, MODBUS RTU, | DNP3,MODBUS RTU,IEC103 | ||
|