China Ied′s 69kv 3 Phases Transformer Differential Protction, Find details about China Differential, Relay from Ied′s 69kv 3 Phases Transformer Differential Protction
IED´S TRANSFORMER DIFFERENTIAL RELAY | 69KV TRANSFORMER DIFFERENTIAL TREALY | ||
PROTECTIONS | OFFERED | ||
QUANTITY | 3 | yes | |
MOUNTING | INCLUDING WHERE CNEL EP INDICATE | yes | |
DIFFERENTIAL | 87 T | YES | |
OVERCURRENT ( 1 and 2 WINDINGS )) | 50/51 | YES | |
50N/51N | YES | ||
5OG / 51G | YES | ||
NEGATIVE SEQUENCE | 46 | YES | |
TEMPERATURE | 49 | YES | |
INRUSH | YES | ||
FAULT FUSE | IF | YES | |
ALARM ANNUNCIATORS | PROGRAMMABLE LEDS | YES | |
INTERNAL COMPENSATION | IF | YES | |
RESTRICTION OF HARMONICS | 2.5.3 | YES | |
SLOP (ramps) | 3 MINIMUM | YES | |
MEASUREMENTS | |||
I dif. | Differential current | YES | |
(I) bar. | Restriciion currents | YES | |
I | Current primary and secondary dedavano | YES | |
CURRENT | I | YES | |
VOLTAGE | V | YES | |
POWER FACTOR | FP | YES | |
POWERS | ACTIVE, REACTIVE AND APPARENT | YES | |
KEYPAD OPTION | |||
OPEN (IN A PHYSICAL WAY) | YES | ||
CLOSE (IN A PHYSICAL WAY) | YES | ||
TRIGGER | TRIPOLAR | YES | |
EVENT LOG | |||
OSCILOGRAFIAS | Pre fails - post failure | YES | |
DATE | YES | ||
TIME | YES | ||
FAULT CURRENT SEQUENCE +, - AND 0 | YES | ||
FAULT SIGNALLING | USE OF LED | YES | |
INPUTS AND DIGITAL OUTPUTS | |||
DIGITAL INPUTS | 6 MINIMUM | 7 | |
DIGITAL OUTPUTS | 6 MINIMUM | 7 | |
CURRENT NOMINAL SECONDARY | 1-5 AMP | YES | |
ADJUST TAP | LESSER or equal 0.5 In | YES | |
STANDARDS | ANSI-IEC | YES | |
POWER SUPPLY 1 | 80-240 VDC | YES | |
POWER 2 | 80-240 Vac | YES | |
PULSES OF VOLTAGE | DIGITAL INPUT, DIGITAL OUTPUT | YES | |
WARRANTY | |||
10 YEARS | MINIMUM | YES | |
TERMINAL TEST - SHORTCIRCUITABLE | |||
TERMINAL TEST - SHORTCIRCUITABLE | SHORTCIRCUITABLE TERMINALS AND TESTS SHOULD COME WITH THE INSTALLATION MANUAL IN SPANISH, THE TERMINAL BOARD MUST BE ABLE TO WITHSTAND VALUE OF INJECTION OF SECONDARY CURRENT MINIMUM 100 A. IS ACCEPTED THAT THE TWO TERMINALS COME IN A SINGLE ELEMENT, IN CASE THAT THE PURCHASE INCLUDE BOARD POSITION, TERMINALS MUST BE ALREADY INSTALLED AND READY TO OPERATE. THE PROTECTIONS OF CNEL EP GROUP WILL CARRY OUT INJECTION TESTING ALTOGETHER WITH A TECHNICIAN OF MANUFACTURES OR SERVICEMAN OF THE OFFEROR AND VERIFY THE OPERATION THEREOF IN CONJUNCTION WITH THE PROTECTION RELAY. | YES | |
CERTIFIED TRAINING | |||
TRAINING CERTIFIED IN SPANISH LANGUAGE WITH CERTIFIED INSTRUCTOR FROM FACTORY | 1 training 5 days, after that the OFFEROR is required to give training for a year until they are solvent doubts IED´s. this under prior coordination with the administrator of the contract of CNEL EP, these skills will be two-day minimum 5 times A year, to failure to comply with this shall present its poor compliance for future contracts offered by CNEL EP. | YES | |
2 SUBJECT PROTECTIONS SETTINGS, THE PERSON WHO WILL GIVE THE TRAINING MUST BE PROTECTIONS ENG. AND SHOULD BE IN FULL KNOWLEDGE OF THE SUBJECT, ABLE TO RESOLVE ALL QUESTIONS SUBMITTED AT THAT TIME. | YES | ||
3. COMMUNICATION TO THE CONTRACT ADMINISTRATOR | YES | ||
4. IEC 61850, WANT TO MAKE AN EXAMPLE TWO IED´s this should be demonstrated and IN FULL ACCEPTANCE OF THE GROUP ASSISTANT TO THE TRAINING. | YES | ||
5. EVIDENCE OF CURRENT INJECTION | YES | ||
6. INSTALLATION ON THE SAME FIELD, IF IT REQUESTED SEVERAL INSTALL ONE AS EXAMPLE, PART OF THE TRAINING. | YES | ||
LICENSE | FREE (N NUMBER OF USERS) | YES | |
LOCAL TECHNICAL SUPPORT | ADDRESSES, PHONES, RESPONSIBLE WITH STAFF TO SUPPORT TECHNICIAN, DOCUMENT NOTARIZED SIGNATURE | YES | |
MANUAL | Spanish | English | |
AMBIENT TEMPERATURE | MORE THAN 40 DEGREES, LESS THAN THAN 10 | YES | |
CERTIFICATES | |||
CERTIFICATE OF SOLE REPRESENTATIVE AUTHORIZED BRAND IN PROTECTION RELAYS | OK | YES | |
CERTIFICATE KEMA IEC 61850-6, 7-1, 7-2, 7-3, 7-4 and 8-1 | OK | YES | |
CERTIFICATES STANDARD ISO 9001 | OK | YES | |
CERTIFIED NOTARIZED THAT CONSISTS WITH TECHNICAL WITHIN THE EQUATOR TO HAVE SOLUTIONS HOME- DIATAS | OK | YES | |
COMMUNICATIONS | |||
PORTS | TYPE | DESCRIPTION | |
FRONT | RJ-45, RS 485 | FIELD CONFIGURATION | RS232 |
2 PORTS, REAR | ETHERNET | NETWORK CONFIGURATION WITH REDUNDANCY DOUBLE OR RING, SCADA INTEGRATION CONFIGURATION | YES |
2 PORTS, REAR | FIBER OPTICS | NETWORK CONFIGURATION WITH REDUNDANCY DOUBLE OR RING, SCADA INTEGRATION CONFIGURATION | YES |
1 PORT | DB9-IRIG-B | TIME SYNCHRONIZATION | YES |
1 PORT | RS-485 | THE SCADA INTEGRATION | YES |
CALIBRATION AND TESTING | OK | THE CONTRACTOR MUST GIVE IT | YES |
SETTINGS | OK | CNEL EP ESM | YES |
PROTOCOLS | ETHERNET | YES | |
MODBUS/TCP, DNP3/LAN/WAN, FTP, TELNET, PING, IEC 61850 | YES | ||
SERIAL | YES | ||
DNP3, MODBUS RTU, | YES |