Rubber Cooling Machine/Batch off Cooling Machine

China Rubber Cooling Machine/Batch off Cooling Machine, Find details about China Film Cooling Line, Rubber Production Line from Rubber Cooling Machine/Batch off Cooling Machine

Model NO.
XPG
Color
Customer Made
Co
ISO BV
Brand
Maoyuanfeng
Country of Origin
China
Production Capacity
20sets/Month
Electronics
World Famous Brand
Type of Machine
Material Processing Machine
Warranty
One Year
Packaging
Wood Carton
Trademark
MYF
Transport Package
Wood Carton
Specification
BV, SGS, CE, ISO9001
Origin
China
Model NO.
XPG
Color
Customer Made
Co
ISO BV
Brand
Maoyuanfeng
Country of Origin
China
Production Capacity
20sets/Month
Electronics
World Famous Brand
Type of Machine
Material Processing Machine
Warranty
One Year
Packaging
Wood Carton
Trademark
MYF
Transport Package
Wood Carton
Specification
BV, SGS, CE, ISO9001
Origin
China
Product Profile:
  The batch off cooling machine is used for cooling, folding and depositing the rubber strip that comes from the open mills or twin screw extruder.
Specification Technology Parameter:
        ModelXPG-600XPG-800XPG-900
Max Rubber Sheet Width600800900
The Thickness Of Rubber Sheet (mm)
 
4-104-106-12
Linear Speed of Taking-in Sheet11~22m/min0~26m/min3~35m/min
Axial Fan0.37KW  5760m3/h0.37KW  5760m3/h0.37KW  5760m3/h
Swing range and frequency1.3m 10-16/min1.3m 10-16/min1.3m 10-16/min
Rubber strip temperature after cooling≤Room temperature+5ºC≤Room temperature+5ºC
≤Room temperature+5ºC
Speed-adjusting frequency motor of lifting deviceXWD5.5-1/23XWD5.5-1/23XWD5.5-1/23
Speed-adjusting frequency motor of rubber swing deviceXWD1.1-5-1/87XWD1.1-5-1/87XWD1.1-5-1/87
Rubber bar pitch160 or 101.6160 or 101.6160 or 101.6
Max hanging height of rubber strip1400mm1400mm1400mm

Our Machine Advantage:
  there are two structure types: overhead and floor-standing types, whose hanging racks are vertically turning with compulsive cooling. The rubber strip hanging bar adopts step by step cylinder or motor-reducer for driving. It consists of mainframe and electrical control system. The mainframe is composed of splicer, printing, slitter, isolation cooling, lifting device, hanging strip cooling, auto wig wag section, weighing, handrail, platform and supporting bracket etc. The electrical control system consists of main control cabinets, and there're emergency stop device in key areas.
  Clients can choose high or low disposition according to the practical requirements. The high disposition batch-off line has hydraulic auto wig wag section, which can battle the rubber strip tidily, the strip tidy ratio≤100mm;there are three working positions for auto entering and outputting of material tray; auto rubber collecting device; auto cutter device; it has high automatization and can realize nobody operating.
FQA-Problems of customer concern:
About machine performance quality
1. Q: How to guarantee the quality of outsourcing parts?
   A: First choice more than 2 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2. Q: Which brand of electric part?
   A: Use world famous brands, Siemens, Omron, Toshiba, Schneider, ABB
Customer can specify the brand.
3. Q: Which PLC:
   A: Siemens, Omron, Mitsubishi
4. Q: How to control the quality?
   A: There are inspectors for inspecting equipment quality and performance, after assembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.
About installation
1. Q: When the guide engineer arrive at customer's factory?
   A:  If need installation on site, engineer will arrive at factory within one week after machine arrived at factory.
About after-sales service
1. Q: What is the warranty time?
   A: 2 years after machine arrived at factory
2. Q: How to solve the problem?
   A: Within one hour after getting customer' problem, inform the solution way, there are three ways for different conditions. 1, Which can be solved by phone or Email, it will be solved in two hours. 2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem). 3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.


Rubber Cooling Machine/Batch off Cooling Machine
Rubber Cooling Machine/Batch off Cooling Machine