China 300bph 5 Gallon Barrel Water Production Line, Find details about China 5 Gallon Water, Filling Machine from 300bph 5 Gallon Barrel Water Production Line
Small Business 5 Gallon Water Bottling Plant/ Filling Machine
This filling line specially productes 3-5 gallons barreled drinking water, with type 120 type, 150 type, 200 type, 300 type, 450 type, 900 type and 1200 type. It integrates bottle washing, filling and capping into one unit.
1. water treatment
2. Outside Barrel Washer
3. Inside Barrel Washer
4. Decapper
5. Automatic barrel Loading Machine
6. Rinser/Filler/Capper Monoblock
7. Heating Shrink Tunnel
8. Conveyor System
9. Complete Line Control System
10.Bottle blowing machine
1) The empty barrels get into the machine by transmission chain automatically. After two times inspection by count sensor, the barrels will be blocked by blocking cylinder. At the same time, rear de-cap cylinder down to cover the cap; rear cap grabbing cylinder up to grab cap. Then the de-cap cylinder reset to de-cap the cap.
2) After several seconds, the two de-cap cylinders reset, then cap grabbing cylinder down to release caps. Meanwhile, the cap blowing electromagnetic valve starts to blow caps. The barrels that have no cap get out of the decap machine automatically. After two times inspection by count sensor, de-cap and blocking cylinder reset.
3) After inside and outside brushing, the empty barrels get into the automatic feeding system.
4) When the number of barrels reaches 4, the blocking cylinder will stop the barrels
5) rear barrel pushing cylinder reset after pushing barrels on barrel turning shelf
6) rear barrel reversing cylinder turn barrels to flat and be ready to get in.
7) The rear barrel pushing cylinder push barrels into barrel washing base then reset.
8) Barrel washing spindle works, then barrels moves a working position to be inverted by the action of conveyor chain
Service Advantage:
1.Competitive price with good quality.
2.ODM/OEM service available.
3.In-time delivery guarantee.
4.One year warranty for whole machine.
5.One year spare parts free of charge.
6.Engineers available for installation and setting up.
7.Training of workers to handle operation.