5 Gallon Bottle Water Filling Line with Internal External Brusher Water Filling Production Line ( QGF )

China 5 Gallon Bottle Water Filling Line with Internal External Brusher Water Filling Production Line (QGF), Find details about China Rotary Filling Machine, Barrel Filling Machine from 5 Gallon Bottle Water Filling Line with Internal External Brusher Water Filling Production Line (QGF)

Model NO.
QGF
Automatic Grade
Automatic
Certificate
ISO9001, SGS
Power
by Order
Control
PLC
PLC
Mitsubishi
Trademark
Beyond
Transport Package
International Standard Export Packages
Specification
CE; SGS
Origin
Zhangjiagang, Jiangsu, China
HS Code
8422301090
Model NO.
QGF
Automatic Grade
Automatic
Certificate
ISO9001, SGS
Power
by Order
Control
PLC
PLC
Mitsubishi
Trademark
Beyond
Transport Package
International Standard Export Packages
Specification
CE; SGS
Origin
Zhangjiagang, Jiangsu, China
HS Code
8422301090
5 Gallon Bottle Water Filling Line (QGF)
5 Gallon Bottle Water Filling Line with Internal External Brusher Water Filling Production Line (QGF)

Features:
1. QGF series barreled production line consists of washing, filling and capping. 2. It is suitable for filling of all kinds of round and square barrels.
3. The production line adopts electric-program control.
4. It has safe devices, such as interlock, signal, automatic check and so on.
5. Its key parts are imported and their quality is reliable.
6. The whole machine is made of stainless steel.
7. It meets the demands of food hygiene.
8. Its structure is reasonable and its operation is convenient.
9. It is ideal equipment for producing mineral water, super-pure water, space water and distilled water.

 
ModelQGF-120QGF-240QGF-450  QGF-600QGF-900QGF-1200
Filling Heads123468
Volume(L)18.9
Barrel Size(mm)φ 270× 490
 
Capacity(b/h)120-150240-300400-450500-600700-8001000-1200
Gas Pressure(Mpa)0.4-0.6
0.4-0.6
0.4-0.60.60.60.6
Gas Consumption(m ³ /min)0.37
0.6
0.811.21.5
Moto Power(kw)1.381.753.87.5913.5
Rated Voltage(V)380V/50Hz
Weight(kg)68012001600200035004500

5 Gallon Bottle Water Filling Line with Internal External Brusher Water Filling Production Line (QGF)5 Gallon Bottle Water Filling Line with Internal External Brusher Water Filling Production Line (QGF)5 Gallon Bottle Water Filling Line with Internal External Brusher Water Filling Production Line (QGF)5 Gallon Bottle Water Filling Line with Internal External Brusher Water Filling Production Line (QGF)
Service Term
1. Installation
The initial installation is not included with the professional member. All installation with our team must be scheduled at least 4 weeks in advance before actual trip taken. All necessary connectivity must be ready prior the service being scheduled.
 
While our professional member arrives at the site for a completed and final installation, two days training course will be provide to the customer for operation and maintenance procedure. The initial installation is provided within 5 working days  . The actual installation days many vary, based on different machine mode and packing lines. Each day of working hour consist at 8 working hours. Any additional day will be charge according to our service fee listed below.
 
When initial installation is being called for our professional member required, the surcharge will be made advance by the purchase at US$80/person/day plus all travel expenses. Travel expenses include documentation fees visa charge); local and destination transportation charges  air, train, ferry, bus, taxi or any means of transportation required to arrive to/from destination); accommodation (minimum of 3 star hotel facility) and 3 daily hot meals.
 
2. Translator
If translator is required and can't be provided by purchaser then we will provide a translator for same charge as initial installation stipulated above. All communicate with our engineer should be in Chinese. Any translation provide by us will be based between English and Chinese only. Purchaser is responsible for the translation between local language and English.

Commercial Terms
1. Warranty
All parts are under two Year Warranty with defects from manufacturer. Any other defect caused by human error, mishandling, wear-and tear & any foreseeable conditions will not be covered by this warranty. All electronic parts and component can be guaranteed by original part's manufacturer or our company.
 
2. Payment
30% of the total contract amount is to be T/T into assigned account at the period of 5 working days after the Purchase contract is signed.
70% of the balance must to be made via T/T of the remainder balance amount of the purchase contract before the ordered equipment is to be delivered 10 working days prior of the shipment.
We also accept L/C payment, 30% down payment, and 70% L/C at sight
 
 
5 Gallon Bottle Water Filling Line with Internal External Brusher Water Filling Production Line (QGF)
5 Gallon Bottle Water Filling Line with Internal External Brusher Water Filling Production Line (QGF)