D4c D4d Idler Wheel Bulldozer Parts Front Idler for Cater

China D4c D4d Idler Wheel Bulldozer Parts Front Idler for Cater, Find details about China Construction Machinery, Machinery Part from D4c D4d Idler Wheel Bulldozer Parts Front Idler for Cater

Trademark
OEM or ODM
Transport Package
Standard Exported Wooden Pallet or Negotiation
Origin
China
HS Code
84314990
Trademark
OEM or ODM
Transport Package
Standard Exported Wooden Pallet or Negotiation
Origin
China
HS Code
84314990
D4c D4d Idler Wheel Bulldozer Parts Front Idler for Cater
Condition: New
Applicable Industries: Machinery Repair Shops, Construction works 
After Warranty Service: Video technical support, Online support
Video outgoing-inspection: Provided
Machinery Test Report: Provided
Marketing Type: New Product 2021
Place of Origin: Fujian, China
Brand Name: Qiquan
Warranty: 1 Year
After-sales Service Provided: Video technical support, Online support
Certification: ISO9001
Color: black or yellow
Material: 40Mn2/50Mn
Surface Hardness: HRC50-58
Hardness Depth: 8-12mm
Name: Excavator undercarriage spare parts idler assy

Supply Ability
Supply Ability: 120000 Pieces per year

Packaging & Delivery
Packaging Details: Standard exported wooden pallet or negotiation
Port: Xiamen port

D4c D4d Idler Wheel Bulldozer Parts Front Idler for Cater


D4c D4d Idler Wheel Bulldozer Parts Front Idler for Cater


 

D4c D4d Idler Wheel Bulldozer Parts Front Idler for Cater

 

Material
35MnB/40Mn2
FinishSmooth
ColorsBlack or yellow
TechniqueForging/Casting
Surface HardnessHRC50-58,deepth:8mm-12mm
Warranty time1 year
CertificationISO9001
Delivery TimeWithin 30 days after contract established



D4c D4d Idler Wheel Bulldozer Parts Front Idler for Cater
BRANDCATALOGUE
BULLDOZERD20D30D31D37D40D41D45D50D60
D65D68D75D80D85D150D155D275D355
D3CD3DD4CD4DD4HD5D6CD6DD6H
D7GD8KD8ND9ND10ND11N   
KOMATSUPC30PC40PC45PC60PC75PC100PC120PC150PC200
PC220PC300PC350PC400     
CATERPILLARE70BE110E120BE215E235E307E311E312E322
E180E240E200BE320E300E300BE330E325 
HITACHIEX30EX40EX60EX100EX120EX200EX220EX270EX300
EX400EX600UH043UH052UH53UH07UH081UH082UH083
FIAT-HITACHIFH120FH130FH150FH200FH220FH270FH300  
VOLVOEC55EC130EC150EC200EC210EC240EC290EC360 
DAEWOODH55DH130DH180DH200DH280DH300DH320  
HYUNDAIR60R130R200R210R220R290R320R914 
KATOHD250HD400HD450HD700HD770HD820HD1250  
KOBELCOSK40SK60SK100SK120SK200SK220SK04-2SK07 
SK07N2SK09SK12SK14SK300SK310SK400  
JCBJS70JS75JS110JS130JS160JS180JS200JS220 
JS240JS260JS300JS330     
SUMITOMOSH70SH100SH120SH160SH200SH260SH265SH280SH300
SH340LS2650LS2800LS3400LS4300    
 MX8SE200SE210SE280MX292SE350   
MITSUBISHIMS110MS120MS140MS180     

 

All manufacturer's names,symbols&descriptions are used for reference purpose only,and it is not implied that and any part listed is the product of these manufacturers.
 


D4c D4d Idler Wheel Bulldozer Parts Front Idler for CaterD4c D4d Idler Wheel Bulldozer Parts Front Idler for CaterD4c D4d Idler Wheel Bulldozer Parts Front Idler for Cater
D4c D4d Idler Wheel Bulldozer Parts Front Idler for Cater
1. You are a trader or a manufacture?
We are an industry and trade integration business, our factory located on Quanzhou Nanan Distric, and our sales department is in City centre of Xiamen. The distance is  80Kms, 1.5 hours.

2. How can I be sure the part will fit my excavator?
Give us correct model number/machine serial number/ any numbers on the parts itself. Or measure the parts give us dimension or drawing.

3. How about the payment terms?
We usually accept T/T or Trade Assurance. other terms also could be negotiated.

4. What is your minimum order?
It depends on what you are buying. Normally, our minimum order is one 20' full container and LCL container (less than a container load) can be acceptable.

5. What is your delivery time?
FOB Xiamen or any Chinese port : 20 days . If there are any parts in stock , our delivery time is only 0-7 days.

6. What about Quality Control?
We have a perfect QC system for the perfect products. A team who will detect the product quality and specification piece carefully, monitoring every production process until packing is complete, to ensure product safety into container.