China Telescopic Boom Mobile Construction Hoist 8 Ton Truck Crane, Find details about China Hoist, Lifting Machine from Telescopic Boom Mobile Construction Hoist 8 Ton Truck Crane
Telescopic boom mobile construction hoist 8 ton truck crane
Model | Max Lifting Weight | Cab | Tyre | Motor Power | Lifting Arm | Turntable | USD Price |
Self-Made 6T-A | 6T | Single Cab | 750-16 | 40 | 420*260(5m6knob) | 1.2m | 1.13 |
Self-Made 6T-B | 6T | Single Cab | 750-16 | 40 | 420*260(5m6knob) | 1.2m | 1.14 |
Self-Made 8T-A | 8T | Single Cab | 825-16 | 50 | 470*270(6m6knob) | 1.3m | 1.43 |
Truck 5T | 5T | Single Cab | 700-16 | 40 | 390*240(5m5knob) | 1m | 1.44 |
Truck 6T | 6T | Single Cab | 750-16 | 40 | 420*260(5m6knob) | 1.2m | 1.88 |
Truck 8T-A | 8T | Extended Cab | 750-16 | 50 | 420*270(5.5m6knob) | 1.3m | 1.89 |
Truck 8T-B | 8T | Extended Cab | 825-16 | 63 | 470*270(6m6knob) | 1.3m | 2.21 |
Truck 10T-A | 10T | Extended Cab | 825-16 | 63 | 520*300(6m6knob) | 1.3m | 2.22 |
Truck 10T-B | 10T | Extended Cab | 825-20 | 63 | 520*300(6m6knob) | 1.4m | 2.85 |
Truck 12T | 12T | Extended Cab | 825-20 | 63 | 520*300(7m5knob) | 1.4m | 3.15 |
1. Truck Crane, which can be used in many kinds of bottom layer, having the characteristics of high speed of hole-forming, low pollution and strong maneuverability.
2. A short spiral drill can be used for dry digging, and a rotary drill can be used for wet digging. Equipped with punching hammer, the rotary excavator can be used to drill through the hard strata.
3. It can be expanded at the bottom of the hole, If the drilling tool is used. The rotary excavator adopts multi-layer telescopic drill pipe, which has less support time and low labor intensity.
4. Do not require mud circulating slag and cost saving, which is especially suitable for the construction of urban construction.
5. Hydraulic Oil models are selected according to local climate: 34#, 46# and 68#.
6. After the first time receiving of Rotary Drilling Rig, release diesel and clean the fuel tank. According to the climate, the diesel is added for the same model: -40#, -30#, -20#, -10# and 0#.
7. After 100 hours of all engines work, release and replace engine oil.
8. After 100 hours of all engines work, release and replace the coolant of the water tank.
9. Cummins engine, please timely contact the local service station for the record, so as to maintain it in future. Otherwise all consequences will be at your own peril, when out of warranty time.
hoist material mini 8 ton truck crane
When lifting materials, the drill bit revolves around the vertical axis and makes the axial movement. Soil under the torque and axial force of drill bit will be cutting. During the process of working, under the action of centrifugal force and extrusion of the blade, soil are destroyed and brroke up. The formation of soil flows pressure to the pit wall, at the same time along the surface up to ground. When the soil flow moves to the place, where is no barrier of pit wall, the whole excavation process is completed due to the centrifugal force of the broken earth being thrown around the pit.
There are two factors in the formation of leakage:
1., lax seal.
2. 2., the oil viscosity is not qualified.
Sealed treatment is to replace seals or more replacement parts, variable amplitude, base reversal, due to poor sealing, large leakage, resulting in high oil temperature ratio, and advocate the main points of maintenance of these two directions.
The oil viscosity is not good, the new oil is changed.
3,There is also a physical way to cool down, that is, the installation of hydraulic oil radiator, after the fan blow dryer to reduce the temperature.
Q1: Are you a manufacturer?
A: Yes, our company was established in 1995. We are a professional Rotary Drilling Rig Manufacturer and have many years of technological exchange with Xozhou Heavy Industry Group.
Q2: What does your company produce?
A: The main products of our company include Ground Hole Drilling Machine, Crawler Rotary Drilling Rig, Wheeled Rotary Drilling Rig and Diesel Hammer, Photovoltaic Piling Machines and other Construction Machinery, etc.
Q3: How about your delivery time?
A: Normally the delivery time is about 7-15 days. For some special case, we can make it within 2 weeks, which depends on different products.
Q4: What methods of payment do you accept?
A: We accept T/T, L/C, D/P, D/A, etc. Of course we can have a discussion for this.