China Heavy Duty Industry Overhead Crane-Factory Electric Trolley Bridge Crane, Find details about China Crane, Bridge Crane from Heavy Duty Industry Overhead Crane-Factory Electric Trolley Bridge Crane
QD type double hook moverhead crane is main handling equipment for smelting workshop of steel works . The two hooks are cooperated with each other to finish the work of converying, pouring and hot metal charging of liquid metals in smelting proess. Due to the work situation is very tough, high efficiency and high security are required.
Safety featuresifting Capacity T | 5 | 10 | 16/3.2 | 20/5.0 | 25/5.0 | 32/5.0 | 50/10.0 | |||
Span M | 10.5-31.5 | |||||||||
Lifting height(M) | Main Hook | 16 | 16 | 16 | 12 | 12/11.0 | 16 | 12 | ||
Aux Hook | 18 | 11 | 14/13 | 18 | 16 | |||||
Speed(M/min) | hoist | Main hook | A5 | 12.5 | 8.5 | 7.9 | 7.2 | 7.3 | 7.8 | 5.9 |
A6 | 15.5 | 13.3 | 13 | 9.7 | 9.8 | 9.5 | 7.8 | |||
Aux hook | 14.5 | 12.7 | 12.7 | 19.5 | 13.2 | |||||
Trolley traveling | 37.2 | 43.8 | 44.6 | 44.6 | 37 | 42.4 | 38.5 | |||
Bridge traveling | A5 | 89.8 /92.3 | 89.8-91.9 | 84.7-87.6 | 84.7/ 87.6 | 85.5/88 | 74.2-87.6 | 74.6 | ||
A6 | 116.2/ 117.4 | 112.5-116.8 | 112.5 | 112.5/ 101.4 | 112/ 101.4 | 86.8-101.4 | 87.3 | |||
Weight(Kg) | Trolley | A5 | 2126 | 3424 | 6227 | 6856 | 7185 | 10877 | 15425 | |
A6 | 2224 | 3562 | 6427 | 7180 | 7856 | 11652 | 15765 | |||
Total Weight | A5 | 12715-31405 | 14270-34405 | 19128-39428 | 19947-41497 | 20795-42796 | 26901-52748 | 35317-64880 | ||
A6 | 12991-31596 | 14719-34699 | 20045-41315 | 20984-44225 | 22632-16324 | 28061-55272 | 36075-67242 | |||
Max Wheel Load KN | A5 | 74-125 | 102-160 | 141-205 | 163-231 | 185-255 | 237-327 | 333-450 | ||
A6 | 75-126 | 104-162 | 145-211 | 167-239 | 189-263 | 242-335 | 336-457 | |||
Rail recommended | Trolley | 15kg/m | 43kg/m | |||||||
Bridge | 43kg/m | QU70 | QU80 | |||||||
Power Source | 380V 50HZ 3Phase or based on your request |
Packaging Details
Packing & Delivery terms:
1. Hoist and electric parts will be packed by plywood crate, for avoiding the demage from goods crash and impact during the delivery.
2. Girders and other main parts will be packed by plastic woven cloth, for preventing rust from soppy condition during the transportation.
3. Only the best transport solution will be taken for saving your cost uttermost on finance, security and time.
Delivery Time
Shipped in 30 days after receive deposit