Customized Design Yz Double Girder Metallurgical Overhead Bridge Crane for Melting Iron Factory

China Customized Design Yz Double Girder Metallurgical Overhead Bridge Crane for Melting Iron Factory, Find details about China Crane, Demag Crane from Customized Design Yz Double Girder Metallurgical Overhead Bridge Crane for Melting Iron Factory

Model NO.
YZ
Type
Metallurgical
Span
10.5-31.5m
Lifting Capacity
up to 320t   
Lifting Speed
Variable Speed (Standard)
Lifting Mechanism
Electric Hoist
Power Source
3 Phase 380V 50Hz
Working Class
A5
Control Method
Pedent Button or Remote Control or Cabin
Crane Feature
Easy Operated Overhead Crane
Core Components
Engine, Gearbox, Pressure Vessel ,Gear
Main Electrical Parts
Schneider and Siemens
Warranty of Core
1 Year
After Warranty Service
Video Technical Support, Online Support, Spare PAR
After-Sales Service
Field Installation, Commissioning and Training, En
Local Service
Location Turkey, United Kingdom, United States, V
Color
Required by Customer
Trademark
SZMC
Transport Package
Carbon Steel with Customerized Size
Specification
Carbon steel with customerized size
Origin
Xintai
HS Code
8426112000
Model NO.
YZ
Type
Metallurgical
Span
10.5-31.5m
Lifting Capacity
up to 320t   
Lifting Speed
Variable Speed (Standard)
Lifting Mechanism
Electric Hoist
Power Source
3 Phase 380V 50Hz
Working Class
A5
Control Method
Pedent Button or Remote Control or Cabin
Crane Feature
Easy Operated Overhead Crane
Core Components
Engine, Gearbox, Pressure Vessel ,Gear
Main Electrical Parts
Schneider and Siemens
Warranty of Core
1 Year
After Warranty Service
Video Technical Support, Online Support, Spare PAR
After-Sales Service
Field Installation, Commissioning and Training, En
Local Service
Location Turkey, United Kingdom, United States, V
Color
Required by Customer
Trademark
SZMC
Transport Package
Carbon Steel with Customerized Size
Specification
Carbon steel with customerized size
Origin
Xintai
HS Code
8426112000
Product Description
Features:
1.it is used for lifting 5t~320t stuff;
2.It has beautiful box-typed welded main girders. Computer optimized design for main girders with good performance and light weight;
3.Compact structure, light weight and high lifting height;
4.The Max. span reaches 32 meters;
5.It's widely used in workshops, metallurgy, warehouses and assembly shops etc.

Mechanism :
1. box-type shaped by wielding;
2. High quality carbon steel Q235B and Q345B;
3. the girder connected by high strength screws;
4. Welding seams are tested by X-ray and ultrasound;
5. Forged wheels;
6. Compact structure, small volume and light weight trolley;
7. Lifting mechanism is open type winch trolley;
8. Compact reducer motor drive, step less control, hardened gears and safety disc brake;
9. Good operation performance, step less speed regulating and running smoothly;
10. Main girders Shot blasting sa2.5 after welding to release internal stresses;
11. Painting high quality epoxy zinc-rich primer, and the thickness of oil film is 140μm;

Electric System:
1. Power supply through step less slide lines;
2. Lifting mechanisms and traveling mechanisms are mutually independent and could travel at the same time;
3. Control panel protection degree is IP54;
4. Reasonable components installation, convenient for check and maintenance;
5. Electric cable is suspended in cable saddle, stationary cable trolley which slides on a galvanized C-type steel;

Safety Protection Devices:
Overload limiter, limit switch (lifting and traveling), interlocking protection devices, buffer, track sweep plate, shield, bus bar protection board, anti-collision device, main disconnecting switch, emergency stop system and motor overload protection.

Technical data:
             ItemParameter
1Lifting Capacityup to 320t                      
2The span10.5m~31.5m
3Lifting Height Customized
4The working duty A7
5The working temperature-10ºC to + 60ºC
6Power supply380V,50Hz,3 phase

Detailed Images
Customized Design Yz Double Girder Metallurgical Overhead Bridge Crane for Melting Iron Factory
Customized Design Yz Double Girder Metallurgical Overhead Bridge Crane for Melting Iron Factory

Production Process
Customized Design Yz Double Girder Metallurgical Overhead Bridge Crane for Melting Iron Factory

Packing&Delivery
1)Standard container packing
2)According to customer"s requirements
Delivery Time shipped in 25 days after payment
Customized Design Yz Double Girder Metallurgical Overhead Bridge Crane for Melting Iron FactoryCustomized Design Yz Double Girder Metallurgical Overhead Bridge Crane for Melting Iron Factory

Company Introduction
SZMC is founded in 1989, is the predecessor of Xintai City crane factory, restructuring in 2005.Over the years the company continued to introduce domestic and foreign advanced production technology, absorb the specialized, high-quality professionals, the company strong technical force, advanced process equipment, has a professional engineering and technical personnel, first-class installation team, excellent after sale service, and took the lead through the ISO9001 international quality system certification, with independent intellectual property rights and industrial property rights.With ten series over 60 varieties and various non-standard lifting equipment production capacity, product selling more than 30 domestic provinces and cities and more than 50 countries and regions.
In the corporate culture of "people-oriented, technological innovation", the company attaches importance to talent cultivation and technology introduction, so that the company's products can always meet the requirements of customers and win the praise of the market and users. The company always adheres to the service tenet of "quality first, integrity-based", keeps pace with the times, develops and innovates. So that the company's performance and scale continue to grow. Stable operation, excellent quality, customer first concept, to provide customers with long-term safe and reliable products, so that customers can use more easily, create long-term value for customers. 

Customized Design Yz Double Girder Metallurgical Overhead Bridge Crane for Melting Iron Factory


Certifications
Customized Design Yz Double Girder Metallurgical Overhead Bridge Crane for Melting Iron Factory

Foreign Clients From All Over The World
Customized Design Yz Double Girder Metallurgical Overhead Bridge Crane for Melting Iron Factory

Our Services
Customized Design Yz Double Girder Metallurgical Overhead Bridge Crane for Melting Iron Factory
Customized Design Yz Double Girder Metallurgical Overhead Bridge Crane for Melting Iron Factory                                
FAQ
Q: Are you factory?
A: Yes, we are factory with 31 years old.

Q: How long is your warranty?
Our warranty is 24 months after received the goods.

3. The usage period.
About 30 years under common use.

4. How can we install the crane?
Our senior engineer can be your side to do the installation guide service and training.


If you want our products, please contact with us ASAP! We will do our best for you!