Automatic Tank Construction Welding Machine (arc welding machine)

China Automatic Tank Construction Welding Machine (arc welding machine), Find details about China Small Tank Construction, Tower Welding Machine from Automatic Tank Construction Welding Machine (arc welding machine)

Model NO.
AGW/EGW
Origin
China
HS Code
85153190
Model NO.
AGW/EGW
Origin
China
HS Code
85153190
Automatic Tank Construction Welding Machine

Features:
1.AGW is applied in both inside and outside.
2.EGW is only needed for outside vertical seam welding
3.All the machines are applicable to top-to-bottom tank erection with ground rail
4.First X-RAY qualification rate:above 99%
5.More suitable for erection of tanks less than 50M
6.Hydraulic Lifting device is necessary.

                                                          top to bottom tank construction
Automatic Tank Construction Welding Machine (arc welding machine)
                               
                                     
Automatic Electro-gas Vertical Welding Machine
Automatic Tank Construction Welding Machine (arc welding machine)
                                                     Automatic Girth Welding Machine 
Automatic Tank Construction Welding Machine (arc welding machine)
Configuration:
1Plate cutting & Edge milling machine
2Automatic girth welding machine(AUTO AGW)
3Automatic electro-gas vertical welding machine(AUTO EGW)
4Automatic butt/corner seam welding machine
5Hydraulic lifting system
6Automatic girth seam grinder
7LNG tank welder

For storage tank / tower fabrication and on site construction, we begin to R & D of its automatic equipments and turn-key whole solution since year 2001. After years of development, NAEC developed different fabrication and construction machines for various seams of Oil Storage Tank / LNG Tank / Tower / Tank Farm. The automatic tank welding machines we developed meet CE standard. In the meantime,

NAEC also developed matched equipments for top-to-bottom construction method, which has been widely applied in both China Strategic Oil Storage Project and oversea tank construction project. 


Now NAEC has matured equipment for both bottom-to-top and top-to-bottom tank construction. By NAEC solution, we can help our client to finish one tank construction within one month. The X-ray first qualification rate is no less than 99.5%. And the mechanical performance meets the requirements of low-temperature impact test. 

 
NAEC---- Minimize the outdoor work, Maxmize customer's profit!
Suitable for industries of: OIL AND GAS, REFINERY FACILITIES, OFFSHORE &SHIPBUILDING, POWER PLANT, etc
Reference: CCC, L&T, PEC, Rotary Engineering, Petrol Steel, JSL, etc.
 

Tank Construction Machines

1
Automatic Tank Construction Welding Machine (arc welding machine)

Girth Seam Welding Machine

>Applicable to both bottom-to-top and top-to-bottom tank erection

>Adopting Sub Arc Welding technology

>Standard machine suitable for shell plate width: 1.3M-2.8M

>Max. Efficiency of AGW could be 30 times as manual welding

2
Automatic Tank Construction Welding Machine (arc welding machine)

Vertical Seam Welding Machine

>Suitable for tank plate wall thickness is from 10mm to 50mm

>Motor frequency inverter drive system

>Weatherproof control box with digital display for welding speed

>Travel speed: 0~2200mm/min

>Beveled gear drive reducer, good locking ability in both directions

3
Automatic Tank Construction Welding Machine (arc welding machine)

Butt/Corner Seam Welding Machine

>Applicable to butt seam welding of bottom plates

>With magnetic idler system

>More than 99% Qualified first X-ray test.

>Suitable for both Top-to-Bottom and Bottom-to-Top Tank Construction Method