China Blue Double Cages Sc270/270g Construction Machinery Hoist with Load 5.4t, Find details about China Construction Material Hoist, Construction Passenger Hoist from China Blue Double Cages Sc270/270g Construction Machinery Hoist with Load 5.4t
Construction lifting machine building hoist SC270/270G
Specification of building hoist SC270/270G :
1. Dimension(L*W*H): 2.5*1.3*2.5; 3*1.3*2.5; 3.2*1.5*2.5; 3.6*1.5*2.5; 3.8*1.5*2.5; 4*1.5*2.5;4.2*1.5*2.5. or customized.
2. Power saving, Start current is lower than rated current.
3. Frequency convertible control system.
4. Counterweight: without counterweight.
4. Run smoothly at starting and braking, reduce the fray.
5. Mast section: Paint or hot dipping zinc.
6. Running at various speed up to 96m/mim.
7. Providing timely delivery.
Main parts of building hoist SC270/270G:
Configurations of CHINA Construction Material Elevator
1. Guide rail system
The material hoist/ construction lift/lifts and hoists is equipped with the guide rail system made of 20# steel that is 4.5mm thick.
2. Gear rack
The gear rack is made of 55# steel and its service life is about 10 years.
3. Power system
Same as the engine of a car, the elevating conveyor is the core part of an elevator. The housing is made of 104# GB aluminum to avoid any cracking. The 94# tin bronze is used to produce the worm gear. Other parts like the worm and fluted disc are made of 38# chrome green aluminum. Except the bronze worm gear, all other parts aforementioned should experience heat treatment, blackening and nitride coating. The operating time of the construction hoist is 10 to 15 years.
4. Safety devices
a. Fall arrest device
b. Loading capacity limiter
c. Limit switch
d. Upper limit protection device
e. Lower limit protection device
f. Door limit protection device
g. Escaping window limit protection device
h. Bell warning device
i. Emergency stop protection device
j. Buffering protection device
k. Motor overload protector
l. Transformer short-circuit protection device
m. Phase sequence protection device
5. Cable
We employ genuine GB cable that is guaranteed on quality.
6. Electrical system
The main devices in the electrical system are all imported.
a. The fan installed helps dissipate the heat effectively.
b. With a time delay relay, the construction lift can stop smoothly and steadily.
c. Alarm bell informs users of the starting of the fall arrest device.
d. Failure warning light will send light signals when there is a failure of the motor or electrical system.
7. Protection fence
The outside fence and fence gate are built with plastic-sprayed perforated plate which is one time more expensive than the expanded plate mesh. The price difference is about 240USD.
8. Additional scaling ladder
For each construction hoist, two scaling ladders are added to the drive system to ensure more convenient and flexible installation.
9. Frequency conversion system (optional)
a. Floor selecting function
b. Precise distance for stopping at a layer
c. Protection of gears and racks
d. Gear shifts can be settled to control the lifting speed
e. The passenger hoist can start and stop stably at constant speed with little noise.