Spreading Equipment Prep Station Spray Booth

China Spreading Equipment Prep Station Spray Booth, Find details about China Paint Booth, Car Spray Booth from Spreading Equipment Prep Station Spray Booth

Model NO.
PS700B-II
Filtration System
Primary Filter;Ceiling Filter;Glass Fiber Filter
Control System
Controls Fan, Electric Damper, and Illumination
Installation Way
Sling Hoist or Square Tube Support
Trademark
JZJ
Transport Package
Consist with International Shipping Packaging.
Specification
CE, ISO
Origin
Yancheng Jiangsu
HS Code
8419899090
Model NO.
PS700B-II
Filtration System
Primary Filter;Ceiling Filter;Glass Fiber Filter
Control System
Controls Fan, Electric Damper, and Illumination
Installation Way
Sling Hoist or Square Tube Support
Trademark
JZJ
Transport Package
Consist with International Shipping Packaging.
Specification
CE, ISO
Origin
Yancheng Jiangsu
HS Code
8419899090
Spreading Equipment Prep Station Spray Booth
Specification:
Outside dimension: L7550*W3550*H3150mm
Inside dimension: L6300*W3450*H2700mm
Plenum dimension:L6400*W3550*H450mm
Basement:without basement;2 pits for grill 
Illumination system:ceiling light:36W*4*8units=32pcs;power:1.15KW
Glass:tempered glass
Air ventilation system:1. 5.5kw one set inner motor centrifugal fan with air volume 15400m3/h
2. generator cabin dimension:L1300*W1200*H1600mm
3. electric damper to control the air inlet and outlet volume
Cabin system:1. air intake plenum is made of cold-rolled sheets
2. ceiling boards are made of galvanized steel sheets
3. PVC manual curtains around the sides and slipping on the aluminum alloy rails
4. 50mm EPS panels at the back wall
Generator system:  rear exhaust;square tube frame;power coated
Heat system:without
Filtration system: primary filter;ceiling filter;glass fiber filter
Control system:controls fan, electric damper, and illumination only
Installation way:   sling hoist or square tube support
Total power:7KW
Spreading Equipment Prep Station Spray Booth
Spreading Equipment Prep Station Spray Booth
Spreading Equipment Prep Station Spray BoothSpreading Equipment Prep Station Spray BoothSpreading Equipment Prep Station Spray BoothSpreading Equipment Prep Station Spray BoothSpreading Equipment Prep Station Spray BoothSpreading Equipment Prep Station Spray Booth

Q: Which Port of loading?

A: Mainly ship from Ningbo port / Shanghai Port/Guangzhou Port.

 

Q: What is your MOQ?

A: All the products can be mixed in one container with low MOQ 1pcs.

 

Q: What is the Lead Time?

A: Normally it needs 20-25 days.

 

Q: What is the Payment Terms?

A: T/T/ 30% deposit before production and 70% before delivery.