China AC380V/400V/690V Manual/Auto Operation Intelligent Active Harmonic Filter AHF, Find details about China AC380V 400V 690V 50Hz APF AHF, 200A APF AHF from AC380V/400V/690V Manual/Auto Operation Intelligent Active Harmonic Filter AHF
Product Model Description:
Rated compensation conventional capacity | 50A | 80A | 100A | 120A | 150A | 200A | |
Rated overload capacity | 1.2 times rated current /1 min, 2.5 times rated current /10ms | ||||||
Wiring mode | Three-phase four-wire system (three-phase three-wire system can be customized) under AC380V Voltage class Three-phase three-wire system under AC690V Voltage class | ||||||
Cooling method | Air cooling | ||||||
Ambient temperature | 40°C , up to 55°C , 2%/K over-temperature automatic derating | ||||||
Parallel operation | Support multi-machine parallel connection, can not equal capacity parallel | ||||||
Communications protocol | RS-485, Modbus-RTU communication protocol | ||||||
Rated operating voltage | AC380V±20% | AC690V±15% | |||||
Air cooling requirements (full load) | ≥330m3/h | ≥600m3/h | ≥1000m3/h | ≥1200m3/h | ≥1200m3/h | ≥1000m3/h | |
Noise level | ≤ 60dB | ≤ 65dB | |||||
Harmonic filtering range | 2-51 times | ||||||
Function set | Combination of harmonic compensation, reactive compensation, unbalance compensation and free compensation with priority | ||||||
Dry contact | One input contact: control switch machine; three output contacts: running power failure | ||||||
Altitude | ≤ 3000 m | ||||||
Voltage class | AC380V±20%,AC690V±20% | ||||||
Rated operating frequency | 50Hz±5% | ||||||
Response time | < 5ms | ||||||
Transformer installation location | Power side / load side | ||||||
Dimension(mm) Wallmount | 400x190x570 | 450 x 200 x 620 | 480 x 270 x 707 | ||||
(width x depth x height) Drawer | 530x550x190 | 530 x 550x190 | 475 x 600 x 270 | 550x600x270 | |||
Weight (kg) | 25 kg | 35 kg 70 kg | 70 kg | 62 kg | |||
Protection class Standard IP20 | |||||||
Certification | Type test report of National Electronic Control and Distribution Equipment Quality Supervision Center, China Taier Laboratory Inspection Report |
1) Commissioning/Debugging On-Site;
2) Commissioning/Debugging Remote Online;