China High Temperature Muffle Spark Plasma Sintering Furnace Roller Hearth Kiln Laboratory Heating Equipments, Find details about China Electric Furnace, High Temperature Furnace from High Temperature Muffle Spark Plasma Sintering Furnace Roller Hearth Kiln Laboratory Heating Equipments
Model | Chamber Size(mm) | Maximum (ºC) | Volume (L) | Voltage | Power (kw) | Temperature Control Accuracy | Net Weight (KG) | Electrical Connection (break switch) | ||
D | W | H | ||||||||
KSL-1200X | 100 | 100 | 100 | 1200 | 1.87 | AC:220v 50/60Hz | 0.8 | ±1ºC | 12 | 10A |
KSL-1200X | 150 | 150 | 150 | 1200 | 3.4 | AC:220v 50/60Hz | 2.5 | ±1ºC | 28 | 16A |
KSL-1200X | 300 | 200 | 200 | 1200 | 12 | AC:220v 50/60Hz | 4 | ±1ºC | 45 | 40 A |
KSL-1200X | 300 | 300 | 300 | 1200 | 36 | AC:220v 50/60Hz | 5 | ±1ºC | 72 | 63A |
KSL-1200X | 400 | 300 | 300 | 1200 | 38 | AC:380v 50/60Hz | 8 | ±1ºC | 95 | 63A |
KSL-1200X | 450 | 450 | 450 | 1200 | 125 | AC:380v 50/60Hz | 18 | ±1ºC | 175 | 63A |
KSL-1200X | 610 | 610 | 610 | 1200 | 227 | AC:380v 50/60Hz | 28 | ±1ºC | 240 | 63A |
Packing:
In order to ensure the customer receive the furnace and accessories without any damage, we packed the furnace in three layers.
First, the furnace is wrapped by clear plastic paper, then filled the gap by polyfoam. Finally, it is packed by wooden box.
Shipping:
1.By courier, like DHL,UPS,FEDEX,etc. it usually takes 3-4 days to arrive.
2.By air to the air port, it usually takes 5-7 days to arrive.
3.By sea to sea port, it usually takes 15-30 days to arrive.
4.If your delivery time is very urgent, we suggest you to choose by courier or by air.
5.If it not very urgent,we will suggest you to choose by sea,it is very cheap.
FAQ
1.Is your company accepting customization?
We have our own factory and excellent technical team, and we accept OEM service.