China Construction Machinery Parts Concrete Pump Tremie Pipe, Find details about China Tremie, Spare Parts from Construction Machinery Parts Concrete Pump Tremie Pipe
Description |
Tremie pipes are normally used to pour concrete into a drilled pile, after the steel cage reinforcement is placed in operation, to avoid concrete pile breakage or gaps. |
Main Application |
During the operations they are lowered inside and through the steel cage reinforcement to protect concrete from soil contamination water filtering and to avoid any possible concrete quality corruption. Unicorn Drill tremie pipes are made of quality drawn steel plates in order to guarantee high resistance elements. Pipe sections can be connected by two kinds of coupling system: thread joints and wire cable joints. |
Main Models | 8" and 10" |
Product Name | Tremie Pipe | |||
Material | 20# steel | |||
Technique | Welding (casting for the joints) | |||
Joint | Threaded or wire cable | |||
Diameter (mm) | Length (m) | Thickness (mm) | Funnel (CBM) | Platform (m) |
219 | 0.5/1/1.5/2/3/4 | 3.2 | 0.25/1/1.5/2/3/4/5/10 | 1.5/2/2.5/3 |
260 | 0.5/1/1.5/2/3/4 | 3.2 | 0.25/1/1.5/2/3/4/5/10 | 1.5/2/2.5/3 |
288 | 0.5/1/1.5/2/3/4 | 3.2 | 0.25/1/1.5/2/3/4/5/10 | 1.5/2/2.5/3 |
300 | 0.5/1/1.5/2/3/4 | 3.2 | 0.25/1/1.5/2/3/4/5/10 | 1.5/2/2.5/3 |
350 | 0.5/1/1.5/2/3/4 | 3.2 | 0.25/1/1.5/2/3/4/5/10 | 1.5/2/2.5/3 |
Customize: 1. Diameter: 150~400mm 2. Length: 0.5~4m 3. Thickness: 3~7mm 4. Joint: threaded joint, wire cable joint |
1. How to order the products?
Answer: Send the inquiry with detail item description or with Model number. If there is no packing demand we take it as sea-way packing. If possible please attach one reference picture to avoid any misunderstanding or any links from our website for we get a better understanding.
2. About lead time and shipping time?
Answer : The lead time depend on quantity of order. Usually shipped by sea, small order or urgent order we can send you by air after received your agreement. According the distance from china to your port.
3. What warranty do we provide?
Ans.: We provide 6 months warranty time.
4. What is the lead time?
Ans.: Usually the lead time is 7-10 days after receipt of your payment.
5.What payment terms do we accept?
Ans.: We accept T/T in advance or L/C at sight.