Basic Info
Diameter: 38.1mm, 42.4mm and 50.8mm
Thickness: 1.5mm - 2mm
Material: SS304,SS316,SS2205 etc
Surface: Satin, Mirror or Electroplating PVD gold, black, white etc.
Glass(T): 6 to 20mm
OEM/ODM: Available
Mount: Top mount/Side mount
Installation: Screwing/Welding
Packaging: Warpped by Pearl cotton bag and Put Into One Box
Delivery Time: 25 to 35 days
Delivery Term: EXW,FOB,CIF,CFR
HS Code: 730890000
Product Description Name: | Ablinox Staircase Handrail Pipe Connectors (CC379) |
Function: | handrail, railing, staircase, door, balcony, furniture, etc |
Diameter: | 38.1/42.4//50.8mm, other sizes can be customized |
Technique: | Stainless steel lost wax casting design |
Surface or finish: | Satin;mirror;electroplating,PVD,etc |
Material Analysis: | SS304 - Nickel>8%, Carbon<0.08% SS316 - Nickel>10%, Carbon<0.03% |
OEM/ODM | Available |
MOQ | 100 PCS |
Package | Foam bag, blank box, wooded case, pallet or as customers' request. |
Advantange- With our own stainless steel investment casting production lines and machining lines, give you one stop services.
- With CNC(CNC CENTER),we make the tooling by ourselves.Make you easiler.
- With 50000 square meters workshop located in Zhaoqing city, near Guangzhou port, transportation is convenient.
- Use Germany Spectrometer and Salty Spray to test the raw material.
- We have 15 engineers with strong ability in design and develop new products.
- With ISO 9001:2015, ISO 14001 and OHSAS 18001 system.
- With ERP system,We can give you the production and delivery information at the first time. Also if any quality problem,We can source it and give you the solution very fast.
- Fast reply within 12 hours.
Hot Sell Products
Packing & Delivery
Company IntroductionABL was founded in 2008 by Kate Liang, started from a 400 square meters workshop.
In 2009, Supported by customers and suppliers, ABL moved to a 4000 square meter workshop and expand our business all over the world.
In 2012, We have sold our products to more than 200 countries, and our brand existed
in more than 50 countries in the world.
In 2013, We have passed CUPC,NSF,CE and ROHS cetificate,starting entered into the European and American markets.
In 2014, with fast development, ABL moved to a 50000 square meters factory. We have our own stainless steel investment casting production lines and also completed machining equipments.
In 2015, We set up our management team. We have cooperated with some unversities and getting bigger. At the same time, we are also Alibaba training center.
From 2016 to 2017, ABL passed ISO 9001:2015, ISO14001, OHSAS18001 certificate. we have already cooperated with some top 500 enterprises.
2018, ABL focus more on the Lean Production and preparing for the next five years.
2019, We are going to build a testing center and achieve the higher sales goal.
Production ProcessSteps | Time |
Tooling Making | CNC Center | 7 days |
Casting Process | Wax Injection | 2 days |
Sand Shell Molding | 5 days |
Dewaxing | 1 days |
Pouring | 1 days |
Cutting | 1 days |
Grinding | 1 days |
Cleaning | 1 days |
Machining Process | CNC | 2 days |
Drilling & Tapping | 2 days |
Welding | 2 days |
Stamping | 1 days |
Polishing | 5 days |
Assembling | Ultrasonic Washing | 1 days |
Water Testing | 1 days |
Assembling | 2 days |
Remark: The production time base on standard quantity and process |
Our missionTo change the world's view about Chinese product.
To be the leader in precision casting industry
Our dream- To gain Win-win achievement with all of our clients and supplies
- To be an international famous brand.
- To be a one-hundred-year company
After-sales Service- Reply you fast within 12 hours.
- Have someone to follow up all your inquiry and order.
- We will offer satisfied quality and prices to you.
FAQ1.Where is your factory?Our factory located in Zhaoqing City, Guangdong Province. Factory 50000 square meters with 265 workers.
2.What is your payment term?We do T/T, 30% deposit, balance before delivery. We can also accept L/C.
3.What is the production time?Casting part need 20 to 30 days.
Balustrade and handrail accessories need 25 to 35 days.
Faucet and shower need 40 to 60 days.
4.Is that possible to visit the factory?Sure, we sincerely welcome you to visit our factory, we can also pick you from the hotel.