Ablinox Stainless Steel Tube End Piece Connector

China Ablinox Stainless Steel Tube End Piece Connector, Find details about China End Cap for Handrail, Railing End Cap from Ablinox Stainless Steel Tube End Piece Connector

Model NO.
CC214
Kind
Glass or Rod/Cable
Payment
T/T.L/C
Top Handrail Size
38.1mm/42.4mm/50.8mm
Middle Pipe Size
8mm/10mm/12mm/12.7mm
Material
Stainless Steel
Type
Straight Stairs
Usage
Indoor and Outdoor
Trademark
ABLinox
Transport Package
Cartons
Specification
stainless steel 304
Origin
China
HS Code
730890000
Model NO.
CC214
Kind
Glass or Rod/Cable
Payment
T/T.L/C
Top Handrail Size
38.1mm/42.4mm/50.8mm
Middle Pipe Size
8mm/10mm/12mm/12.7mm
Material
Stainless Steel
Type
Straight Stairs
Usage
Indoor and Outdoor
Trademark
ABLinox
Transport Package
Cartons
Specification
stainless steel 304
Origin
China
HS Code
730890000
 Ablinox Stainless Steel Tube End Piece Connector
        
Stainless Steel Tube End Piece Connector

Crafts:      Casing/Stamping
Connection:   Female
Shape:       Reducing
Head Code:   Round
Color:        According to customers' demand
Certification:  ISO ROHS SGS CE
Port:      Guangzhou/Foshan
Package:  Cartons, Pallets, Wooden case or others
Surface treatment: According to customers' demand
Thickness:    0.8mm to 2.5 mm
Service:    Fast delivery, good after-sale service
OEM/ ODM:   Provided

 
Name:Stainless Steel End cap
Function:Pipe, Handrail balustrade decoration
Diameter:12/16/25/33.7/38.1/42.4/48.3/50.8mm
Thickness:0.8mm to 2.5 mm
Technique:Sheet Metal Forming Technology
Surface or finish:Satin; mirror; electroplating color(gold ,rose gold)
Photometric analysis:G320 satin and G800 mirror finished
Material Analysis:304 - Nickel > 8%,Carbon < 0.08% ;
316 - Nickel >10%, Carbon <0.03% .
OEM/ODMAcceptable
PackagePlastic film, wooden cases ,wooden pallet, or as customers' request


Hot Sell Products 

Ablinox Stainless Steel Tube End Piece ConnectorAblinox Stainless Steel Tube End Piece ConnectorAblinox Stainless Steel Tube End Piece ConnectorAblinox Stainless Steel Tube End Piece Connector

Company Information
 
Company scopeSanitary ware, Handrail Fittings, Investment Casting
Factory locationZhaoqing Guangdong China
Established timeBorn in 2008
Area/Employees5,0000 Square meter /  300 Peoples
Capacity300Ts/Month
Annual sales$ 30 million USD
ABLinox was founded in 2008 by Kate Liang, started from a 400 square meters workshop.
In 2009, Supported by customers and suppliers, ABL moved to a 4000 square meter workshop and expand our business all over the world.
In 2012, We have sold our products to more than 200 countries, and our brand existed
in more than 50 countries in the world.
In 2013, We have passed CUPC,NSF,CE and ROHS cetificate,starting entered into the European and American markets.
In 2014, with fast development, ABL moved to a 50000 square meters factory. We have our own stainless steel investment casting production lines and also completed machining equipments.
In 2015, We set up our management team. We have cooperated with some unversities and getting bigger. At the same time, we are also Alibaba training center.
From 2016 to 2017, ABL passed ISO 9001:2015, ISO14001, OHSAS18001 certificate. we have already cooperated with some top 500 enterprises.
In 2018, ABL focus more on the Lean Production and preparing for the next five years.
In 2019, We are going to build a testing center and achieve the higher sales goal.
In 2020,We have introduced more advanced measuring equipment to ensure the quality of products more accurately.

Ablinox Stainless Steel Tube End Piece Connector
Production Process
 
StepsTime
Tooling MakingCNC Center7 days


Casting Process
Wax Injection2 days
Sand Shell Molding5 days
Dewaxing1 days
Pouring1 days
Cutting1 days
Grinding1 days
Cleaning1 days


Machining Process
CNC2 days
Drilling & Tapping2 days
Welding2 days
Stamping1 days
Polishing5 days

Assembling
Ultrasonic Washing1 days
Water Testing1 days
Assembling2 days
Remark: The production time base on standard quantity and process
Ablinox Stainless Steel Tube End Piece Connector
Certifications
Ablinox Stainless Steel Tube End Piece Connector


FAQ:
1. How to get a quotation?
Please send us drawings in igs, dwg, step etc. together with detailed PDF.
If you have any requirements, please note, and we could provide professional advice for your reference.

   
2. What if we do not have casting drawing?
Samples would be available, and we would send you drawing to confirm.
Of course, we would ensure the safety of the drawing.
   
3. How to pay?
T/T is preferred.
   
4. How to ship?
For small quantity, we have cooperation with DHL,TNT, FEDEX, UPS etc
For big quantity, air or sea would be available for you to choose.


5. What about the packing details?
We have our regular packing.
If you have any special requirements, we would be willing to help.

   
6. What about the delivery time?
It would be 20-30 days normally for the parts to be ready and we had a system to ensure the time.
When you made your order, you would know.