3-10 Tons Hydraulic Material Decoiler Manual Uncoiler Machine

China 3-10 Tons Hydraulic Material Decoiler Manual Uncoiler Machine, Find details about China Manual Decoiler Machine, Decoiler machine Machine from 3-10 Tons Hydraulic Material Decoiler Manual Uncoiler Machine

Model NO.
wd-1500
Usage
Roof, Wall
Transmission Method
Electric
Raw Material
Metal Rolls
Trademark
WDL
Transport Package
Plywood Case
Specification
1.0*0.8*1.1
Origin
China
HS Code
8462211000
Model NO.
wd-1500
Usage
Roof, Wall
Transmission Method
Electric
Raw Material
Metal Rolls
Trademark
WDL
Transport Package
Plywood Case
Specification
1.0*0.8*1.1
Origin
China
HS Code
8462211000
3-10 tons hydraulic material decoiler manual uncoiler machine

1.The main product description:
    Now there are many types of decoliers in Wadley  , rougly we divide them into three types: Hydraulic drives, electric drives and manual operation version.Those decoilers could be used with many types machine like slitting machine, cutting machine, leveling machine and others.
    We are involved in manufacturing and export a comprehensive range of decoilers and uncoilers. Fabricated as per set industrial standards, our range of available in both motorized and non-motorized form. Stringently checked on quality parameters, these are available in various capacities and specifications to meet variegated demands of clients.Steel Plate Leveling Machine/Straightening Machine/Decoiler and Straightening Machine
2.The product features:
(1).Automatic Operation
Decoiler rotation is automatically loop arm controlled. The loop arm controls variable speed operation, providing smooth stops and starts. Variable speed reduces decoiler.
(2).Safety
The decoiler rotary drive system and mandrel expansion power is fully guarded. The pendant control allows disabling automatic rotation during coil loading.
(3).Electrical Requirements
Three phase electrical supply is required. Equipment can operate from 220-575 volts in 50 or 60 hz.
(4).Construction
Construction includes steel plate and heavy structural sections. Plate seams are seal welded. Structural bracing is included where required. Mandrel expansion & contraction is by a link system including bronze bearings.
(5).Decoiler Finish
After fabrication completion, the decoiler framework is machine cleaned and powder coated prior to electro-mechanical assembly.
(6).Coil Car Option
A coil car with weight capacity matched to the specified decoiler can be included. The coil car includes a 'v' shaped surface to center coils during movement. The coil car includes sufficient vertical travel to touch the mandrel lower surface when fully extended. The powered coil car moves along steel tracks mounted within the decoiler base. Hydraulic check valve prevents vertical coil drop in the event of hydraulic pressure loss.
(7).Installation
The decoiler and coil car can be installed by placing on a typical industrial concrete foundation and drilling holes for concrete expansion bolts. 
Steel Plate Leveling Machine/Straightening Machine/Decoiler and Straightening Machine

3.Parameters:
DescriptionSpecification
hydraulic Pump Station :3KW
feeding roller's width: 1350mm
Out line dimension of machine: 1.0*0.8*1.1
Total weight:10t, 5t
4.Detail images:
Steel Plate Leveling Machine/Straightening Machine/Decoiler and Straightening Machine
Steel Plate Leveling Machine/Straightening Machine/Decoiler and Straightening Machine
Steel Plate Leveling Machine/Straightening Machine/Decoiler and Straightening Machine

5.Packing&delivery:
Steel Plate Leveling Machine/Straightening Machine/Decoiler and Straightening Machine
6.FAQ:
Q1.How to send my enquiry?
You can contact us by email, phone call, message (Whats APP, We Chat, Skype).

Q2.How long can I get feedback after enquiry?
We will reply you within 3 hours in working day.

Q3.Delivery time
Machines order takes 30 days after deposit payment received. Please inquiry sales.

Q4.What is the package? Is it suitable for shipment?
Machine is by waterproof cloth to covered. And be packed by standard exported wooden case with steel foot. It is very much strong for oversea transportation. 

Q5.Payment term
30% T/T as down payment, balance 70% by T/T before delivery. If others payment terms, we can discuss the details. Welcome to inquiry sales.

Q6.Can I trust you?
Sure, we're Made in China Gold Suppliers,

Q7.How long is the warranty for machines?
Machines warranty is 12 months after receive goods. in Warranty time,we can provide new free parts for changing.

Q8.Can you engineer come to our place to help with machine installation & commission?
Yes, our engineers are available to travel to your place. Round flight tickets & accommodation will be at your cost.