Features & Advantages1. Diesel engine emmissions conform to the latest environmental regulations. It is equipped with the world famous brand hydraulic components.
2. Hydraulic excavator can be equipped with electromotor which has the unique advantages of zero emissin, low noise, low operation&maintenance.
3. Hydraulic excavator can be equipped with dual powers by diesel engine and electromotor, it share the electic excavator's unique advantages and diesel engine's mobile convenience.
4. H-type undercarriage with disassembled featured as simple structure and high torsion-resistance, more stable and reliable.H-type undercarriage with disassembled technology is accordance with all standards for road, railway and sea transportation.
Specifications Item | Unit | Data |
Machine weight (Backhoe) | t | 48 |
Machine weight (Face-shovel) | t | 49 |
Bucket capacity (Backhoe) | m3 | 1.6-2.5 |
Bucket capacity (Face-shovel) | m3 | 2.0-3.0 |
Rated power/speed | kW/rpm | 298/1800 |
Max. flow | L/min | 2×350 |
Max. operation pressure | MPa | 31.4/34.3 |
Cycling time of operation | s | 16 |
Swing speed | rpm | 7.3 |
Travel speed | km/h | 3.2/5.2 |
Max. pulling force | KN | 354 |
Grade ability | % | 35°(70%) |
Working Data | | Backhoe | Face-shovel |
Max. digging reach | mm | 12020 | 8550 |
Max. digging depth | mm | 7760 | 2770 |
Max. digging height | mm | 10970 | 9920 |
Max. dumping height | mm | 7660 | 7370 |
Max. digging force of Stick | KN | 217 | 269 |
Max.digging force of Bucket | KN | 236 | 271 |
Product ShowCertificateService on SitePacking & ShippingFAQ1: What about the delivery time?A: It depends on the type of machine. In general circumstance, it will take more than from 60 days to 90 days to produce the ordered machine after receiving the deposit. But we can reduce to 10 working days if the machine are in stock.2: Which payment terms can be accepted?A: Normally our payment term is based on by T/T (30% down payment, 70% before shipment) or irrevocable Letter of Credit at sight. But if you prefer other payment terms please contact us for further information.3: What is the warranty time?A: The warranty period shall be 15 months counted from goods arrival in Chinese port, or 1 year (12 months) or 2000 operating hours since handover (after assembling and commissioning) on operation site, whichever comes earlier.4: How soon can you respond client inquires?A: Our team is consisted of a group of diligent and dynamin people, working 24/7 to respond clinent inquires and questions all time, most of them can be solved within 12 hours.5: What kind of logistic service do you supply?A: We can ship construction machinery by various transportation ways including by road, railway and container. For light spare parts in urgent demand, we can send it by international express service, such as DHL, TNT, UPS, FedEx, or by Air.6. What about the Minimum Order Quantity?A: The MOQ is 1 pcs.