OIML C3 Double Shear Beam 10t~40t Zemic Load Cell

China OIML C3 Double Shear Beam 10t~40t Zemic Load Cell, Find details about China Load Cell, Sensor from OIML C3 Double Shear Beam 10t~40t Zemic Load Cell

Model NO.
LP7150
Material
Alloy Steel
IP Rating
IP67
Customized
Customized
Usage
Position Sensor
Theory
Resistance Sensor
Output
Analog Sensor
Creep (30 Min)
Creep (30 Min)
Accuracy Class
OIML C3
Accuracy
3000e
Trademark
LOCOSC
Transport Package
Carton
Origin
China (Mainland)
HS Code
9031809090
Model NO.
LP7150
Material
Alloy Steel
IP Rating
IP67
Customized
Customized
Usage
Position Sensor
Theory
Resistance Sensor
Output
Analog Sensor
Creep (30 Min)
Creep (30 Min)
Accuracy Class
OIML C3
Accuracy
3000e
Trademark
LOCOSC
Transport Package
Carton
Origin
China (Mainland)
HS Code
9031809090
Packaging Details Foam and carton
Delivery Time  30 days or order

 
Rated Capacity10/15/20/25/30/40t
Accuracy ClassC3
Rated Output2.0 ± 0.002mV/V
Total error±0.02%F.S
Creep(30min)±0.02%F.S
Input Resistance760±10Ω
Output Resistance702±3Ω
Operating Temperature-10 - +40ºC
Safe Overload150%F.S
Destructive Load300%F.S
Excitation Recommend4-12VDC  Max:15VDC
Cable Length8~16m    4 wires with shield     
Exc+(red) Exc-(black) Sig+(green) Sig-(white)
Construction Alloy Steel or Stainless steel,IP67
OIML C3 Double Shear Beam 10t~40t Zemic Load Cell
OIML C3 Double Shear Beam 10t~40t Zemic Load Cell
OIML C3 Double Shear Beam 10t~40t Zemic Load Cell

OIML C3 Double Shear Beam 10t~40t Zemic Load Cell





OIML C3 Double Shear Beam 10t~40t Zemic Load Cell



1. What essential information is needed for product selection?
  
 Weight/ load range (in g, kg, ton or lb), application, material (stainless steel, alloy aluminum, etc.) and other requirement of customers.


2. How will you ensure quality of your products?
  
  A. All products had been treated through strict process according to ISO9001 standard and checked by IQC and OQC department before shipping.
   B. One year warranty and life time free consult to any needs related with our product.


3. What terms of payment is acceptable?
    
T/T

4. When production could be arranged?
   As soon as the payment was received.