China Exchangeable Table Fiber Laser Cutting Machine for Metal Sheet Cutting, Find details about China Cutting Tool, Engraving Tool from Exchangeable Table Fiber Laser Cutting Machine for Metal Sheet Cutting
Model | EETO-FLX3015 Series |
STRUCTURE | Gantry type |
OUTPUT POWER | 500W~6000W |
LASER SOURCE | Raycus, China |
CUTTING AREA (L*W) | 3000*1500mm |
MAX CUTTING THICKNESS | 25mm CS; 16mm SS; 12mm Alu; 8mm Brass; 6mm Red Copper |
MAX CUTTING SPEED | 55m/min (1mm thickness) |
MAX IDELING SPEED | 120m/min |
DRIVEN STRUCTURE | Duel-driven |
DRIVEN MODE | Servo control |
X AXIS STROKE | 3020mm |
Y AXIS STROKE | 1520mm |
Z AXIS STROKE | 150mm |
POSITIONING ACCURACY | ±0.03 mm |
RE- POSITIONING ACCURACY | ±0.02 mm |
CUTTING GAP | 0.1mm |
COOLING SYSTEM | Water Chiller |
AMBIENT TEMPERATURE | 5ºC-45ºC |
BEARING WEIGHT OF TABLE | 1000Kgs |
CONTINIOUS WORK TIME | 24H |
PROTECTION LEVEL | IP54 |
TOTAL GROSS WEIGHT | 10 Tons |
TOTAL DEMENTION(L*W*H) | 4270*2300*2180mm |
POWER SUPPLY | AC380V±5%(50Hz/60Hz) |
TOTAL POWER | <12 |
After-sales Service
1. Based on Service-oriented conception, complete pre-sales and after-sales services for customers will be provided like installation, testing, training and maintenance.
2. Before signing a contract, parameters and processing technics will be explained and given to customers to make product fully comprehended.
3. After signing a contract, transport vehicle or ship will be arranged to carry goods to the appointed location within delivery period, and engineers will be sent on site later for installation, lasting 1-2 days.
4. Training period takes about 3-4 days till all the operations are perfectly performed under regulations.
5. We promise to visit our customers once a year ,during the visit, we will help them with machine maintenance, operation, and enhance their knowledge and operation skills.
Power-on/off procedures
Operations of control panel ;
Parameter setup
Operations of software; Clean and maintenance
Common hardware troubleshooting; Warnings during operation.
Extra Tech Support
Two-year warranty guaranteed from EX-factory, meanwhile, lifelong maintenance succeeds after warranty. Any malfunction or damage occurs during warranty ( man-made causes and force majeure exclusively), please email or call us immediately, professional engineers will be arranged on the resolution, all the charges are free including cost of changing new parts (consumable parts excluded).
Our promises: 24 hours on-line service and response time less than 2 hours
15 days after signing a contract, a layout drawing will be sent to user( including preparations on foundation, water, electricity, gas, air/water pipe, interface, etc). Preparatory works and space spared for machine installation are required on user side . Professional engineers then will be dispatched after all these preparations are finished, In order to run everything smoothly, on-site assistance from user side will be quite necessary.