China Ipg 6000W Laser Power for Full Cover Exchange Table Fiber Laser Cutting Machine, Find details about China Machine, Cutting Machine from Ipg 6000W Laser Power for Full Cover Exchange Table Fiber Laser Cutting Machine
Model | EETO-FLX3015-HP-ECO Series | ||
Laser Generator | IPG (Germany) | Structure | Gantry Type |
Laser Power | 6000W | Laser Cutter | Raytools, Switzerland |
Working Area | 3000*1500mm (Customization) | CNC Controller | Beckhoff, Germany |
Max Cutting Thickness | 24mm | Close-Loop Gas System | Closed gas system, EETO |
Max Cutting Speed | 55m/min for 0.5mm | Exchange Mode | Elevation Exchange System |
Max Traveling Speed | 120m/min | Exhaust Syatem | Inductive Type |
Positioning Accuracy | ±0.03 mm | Cooling System | Water Cooling |
Re-Positioning Accuracy | ±0.02 mm | Ambient temperature | 5°C-45°C |
Cutting Tolerance | 0.1mm | Bearing Capable | 1000KG |
Working Time No Stop | 24H | protection Level | IP54 |
Voltage | AC380V±5%(50Hz/60Hz) | Total Weigtht | 10 tonnes |
Total Power | <12 | Dimention | 4300(L)*2200(W)*2300mm(H) |
After-sales Service
1. Based on Service-oriented conception, complete pre-sales and after-sales services for customers will be provided like installation, testing, training and maintenance.
2. Before signing a contract, parameters and processing technics will be explained and given to customers to make product fully comprehended.
3. After signing a contract, transport vehicle or ship will be arranged to carry goods to the appointed location within delivery period, and engineers will be sent on site later for installation, lasting 1-2 days.
4. Training period takes about 3-4 days till all the operations are perfectly performed under regulations.
Power-on/off procedures
Operations of control panel ;
Parameter setup
Operations of software; Clean and maintenance
Common hardware troubleshooting; Warnings during operation.
Extra Tech Support
Two-year warranty guaranteed from EX-factory, meanwhile, lifelong maintenance succeeds after warranty. Any malfunction or damage occurs during warranty ( man-made causes and force majeure exclusively), please email or call us immediately, professional engineers will be arranged on the resolution, all the charges are free including cost of changing new parts (consumable parts excluded).
Our promises: 24 hours on-line service and response time less than 2 hours
15 days after signing a contract, a layout drawing will be sent to user( including preparations on foundation, water, electricity, gas, air/water pipe, interface, etc). Preparatory works and space spared for machine installation are required on user side . Professional engineers then will be dispatched after all these preparations are finished, In order to run everything smoothly, on-site assistance from user side will be quite necessary.