China 100kVA 80/75kw Silent Ricardo R4105azld Diesel Generator, Find details about China DC24V Electric Start Generator, Ricardo Diesel Engine from 100kVA 80/75kw Silent Ricardo R4105azld Diesel Generator
GENSET SPECIFICATION | ||
Model | YN-75GF | |
Rated Power | KW | 75 |
Rated Voltage | V | 400 / 230 |
Rated Current | A | 135 |
Power Factor | 0.8 | |
Rated Frequency | HZ | 50 |
Rated Revolution Speed | RPM | 1500 |
Starting Mode | DC24V Electic Start | |
Overall dimensions | L*W*H mm | 2200*800*1100 |
Net Weight | KG | 920 |
Connection Mode | Three Phase Four Wire Y Type Connection | |
ENGINE SPECIFICATION GENERAL PERFORMANCE | ||
Engine Brand | Ricardo | |
Power | KW | 75 |
Engine Mode | R6105ZD | |
Cylinder | l | 6 |
Bore*Stroke | mm | 105*125 |
Intake Type | Turbocharged | |
Compression Ratio | 17:1 | |
Overload Capacity | 110% | |
Direction Of Rotation | Anticlockwise | |
Cooling Type | Water Cooling | |
Rated Revolution Speed | RPM | 1500 |
ALTERNATOR DATA | ||
Alternator Brand | Shanghai Lantian / Stamford | |
Alternator Mode | STC-75 | |
Rated Power | KW | 75 |
Rated Voltage | V | 400 / 230 |
Power Factor | 0.8 | |
Insulation Class | H | |
Protection Grade | IP22 | |
Connection Mode | Three Phase Four Wire Y Type Connection | |
Accommodation Mode | AVR | |
Output Frequency | HZ | 50 |
1,Wooden Case
2,Custom Require
· After-sales:
Once receive any feedback of quality problem we will respond at the first time, and solve the problems within 24 hours.
· Guarantee:
Warraty period is one year or 1000 hours (depends on which occurs first ). If the failure is caused by turbine manufacturing defects.
we will be responsible for problems caused by quality of production or raw material, except the damageable spare parts of genset caused by crew wearing parts, consumable parts for daily use, human error , negligence or failure of following the original maintenance manual provisions, etc
1. What certificate do you have for generator diesel ?
There are ISO 9001,ISO 14001,CE etc.
2. What is your MOQ, payment method, delivery time?
Our MOQ is only 1 set. Payment method usually is 30% T/T as deposit, 70% balance T/T before delivering,or use trade assurance and L/C.
Delivery period normally will be 7~15 days after receiving customers' deposit.
3. Which port do you often use when export?
Qingdao,Tianjin,Shanghai,Guangzhou or as customer request.
4. Is there any spare parts you can provide along with generators to make the maintenance convenient?
We can provide regular engine's air filter, fuel filter, oil filter to customers for self-maintenance.