Lar /Lox/ LNG ISO Storage Tank Container ASME

China Lar/Lox/ LNG ISO Storage Tank Container ASME, Find details about China LNG ISO Tank Container, LPG ISO Tank Container from Lar/Lox/ LNG ISO Storage Tank Container ASME

Model NO.
1AA-TCS-20000/7 ASME
Double-Acting Cylinder Type
Common Cylinder
Special Cylinder Type
Number of Cylinders
Combination Cylinder Type
Pressurized Cylinder
Total Volume
20000kg
Dimension
12192×2438×2591 mm
Loading Medium
LNG
Working Pressure
0.7MPa
Trademark
DSW
Transport Package
Packed in Foam
Specification
TPED, EN, ISO9809
Origin
China
HS Code
731100
Model NO.
1AA-TCS-20000/7 ASME
Double-Acting Cylinder Type
Common Cylinder
Special Cylinder Type
Number of Cylinders
Combination Cylinder Type
Pressurized Cylinder
Total Volume
20000kg
Dimension
12192×2438×2591 mm
Loading Medium
LNG
Working Pressure
0.7MPa
Trademark
DSW
Transport Package
Packed in Foam
Specification
TPED, EN, ISO9809
Origin
China
HS Code
731100
Material: Steel
Use: Industrial Gas
Pressure: High
Brand Name: DSW
LO2,LN2,LAR Cryogenic Tank (Vacuum Powder Heat Insulation) Specifications
.LO2 Cryogenic Tank, LN2 Cryogenic Tank, LAR Cryogenic Tank, 5M3 cryogenic tank, 10M3 cryogenic tank, 15M3 cryogenic tank, 20M3 cryogenic tank, 30M3 cryogenic tank, 5M3 VERTICAL CRYOGENIC LIQUID TANK, 1.6MPa cryogenic tank, CRYOGENIC LIQUID TANK, cryogenic Horizontal tank, Vacuum cryogenic tank, china produce cryogenic tank, liquid cryogenic tank, 20m3 Low Temperature Storage Tank Cryogenic Tank, Liquefied Natural Gas LNG/, 5m3-200m3 Cryogenic tank, LNG Natural Gas Cryogenic Storage Tank,5m3 Horizontal cryogenic tank,5m3 Horizontal cryogenic tank
CO2 gas cylinder


20Ft/0.7Mpa LNG ISO Tank CONTAINER
1.1 ISO tank container technical spec 

Model:1AA-TCS-20/0.7                                        Insulation type:Multi layer
NOItemsInner vesselOuter vessel
1Design pressure     MPa0.7-0.1(outer)
2Working pressure    MPa0.7-0.1(outer)
3MAWP            MPa0.7/
4Design temperature    ºC-196-19~50
5Working temperature   ºC≥-162normal
6Pneumatic test      MPa0.9HLD
7G. Vol              m3192.3(interlayer)
8E. Vol              m317.1/
9MediumLNGMulti layer
10Main materialSA240M304Q345R
11TreatmentPickling and passivationSanding and coating
12Corrosion allowance  mm01.0
13Joint efficiency10.85
14Filling rate90%/
15Static evaporation   %/d≤0.34(by LIN)
16Seal off vacuum degree Pa≤1×10-2
17Leakage of vacuum interspace  Pam3/s≤1×10-6
17aVacuum degree Pa1×10-2
18ISO code22K7
19Diameter         mmΦ2200Φ2350
20External Dimensions  mm6058×2438×2591
20-aValve cabinet       mmLength: 3063; Height:925
21type    Horizontal
22Tare weight           Kg~7050
23Fully loading weight    Kg~8040
24Design service life10years
25Open pressure for safety valve0.75Mpa
26SortIII
27Approval classification Bureau Veritas
28Portable tank guidelineT75

About us:
Our company is one of main factory in China Chemical Equipment Group, and as well as the biggest pressure vessel manufacturer in Zhejiang. Sep. Established in 1972 years, We're engaged in design and manufacture pressure vessel for more than 40 years, and have the Design License of Special Equipment (Pressure vessels of type ) (RSPZJHG0401-2), It has the following licenses issued by the State Administration of Quality Supervision, Inspection and Quarantine: A1, A2, B3, C2 and C3 pressure vessel manufacturing licenses; the design license for A1, A2, C2 and C3 pressure vessels; and the design license of GC1(3), GC2 and GC3 pressure piping
We have passed ISO9001:2008 International Quality Supervision System Certification.  We own 170000 square meter building size The total assets is 180 million, has 500 workers and staff members, including 55 technician (6 super- engineer, 19 engineer, 10 primary technician, 1 super-technician, 4 technician, 15 Nondestructive Tester (RT, UT). There're 8 departments, such as technology, production, sales, quality, purchase, finance, secretary and standard, 1general management office, 1 international export office (Ningbo DSW), 5 workshops and 1 Installation Company. Set up the Welding Test station with Ningbo Bureau of Quality and Technical Supervision. Quality Guarantee System charged by quality engineer, design engineer, welding.

Lar/Lox/ LNG ISO Storage Tank Container ASME
Lar/Lox/ LNG ISO Storage Tank Container ASME
Lar/Lox/ LNG ISO Storage Tank Container ASME


Inspection guarantee:

The relevant welding seams will be subject to 100% RT non-destructive testing and penetrant testing (PT) according to the technological requirements of storage tank production. High-purity nitrogen (up to 99.999%) will be used to conduct the strength testing. Finally, advanced helium mass spectrometer leak detectors (with precision up to 2×10-9Pa.L/s) will be used to conduct Helium mass spectrometer leak detection. The inner containers of the storage tanks will be passivated by overall pickling to meet the cleanliness requirements for dangerous goods. Imported ultraviolet black light lamps will be used to make sure that there is no oil stain and other organic impurities in the inner containers. The inner and outer containers, after cleaning, will be assembled at a time interval less than 2.5 hours. After assembling, the inner containers and interlayers will be filled with nitrogen to protect them from dust and organic impurities, so as to ensure the cleanliness. The inner and outer surfaces of the outer containers will be subject to overall sandblasting treatment to meet the requirements of Sa-2.5 standard. When the surfaces of steel plates show the metallic color, a vacuum cleaner will be used to suck off the dust adhered to the surface so as to further ensure the vacuum degree in the interlayer. Special high-quality perlite is used as the insulation material in the interlayer. The perlite will be treated by using our company's special process before being in the interlayer. All the internal cylinders, after manufactured, will be subject to the gas-tight and pressure performance tests. Both the internal and outer cylinders will be subject to rigorous Helium mass spectrum leak detection. After the production is completed, all the pipe openings will be opened to carry out nitrogen purging and replacement, so as to meet the oxygen usage standard. After this, all the pipelines and valves will be sealed and the tanks will be filled with 0.2MPa high-purity nitrogen for protecting the tanks.


Lar/Lox/ LNG ISO Storage Tank Container ASME
Lar/Lox/ LNG ISO Storage Tank Container ASME
Lar/Lox/ LNG ISO Storage Tank Container ASME