Hohner Stitching Heads Used in Exercise Book Making Machine

China Hohner Stitching Heads Used in Exercise Book Making Machine, Find details about China Hohner Stitching Heads, Hohner from Hohner Stitching Heads Used in Exercise Book Making Machine

Model NO.
43/6S
Sheet Weight
45-120GSM
Total Power
2.2kw
Max. Output Frequency
45times
Brand
Germany Hohner
Function
Stitching The Notebook
Trademark
LianDong
Transport Package
Wooden Boxes
Specification
CE
Origin
Zhejiang
HS Code
84418090
Model NO.
43/6S
Sheet Weight
45-120GSM
Total Power
2.2kw
Max. Output Frequency
45times
Brand
Germany Hohner
Function
Stitching The Notebook
Trademark
LianDong
Transport Package
Wooden Boxes
Specification
CE
Origin
Zhejiang
HS Code
84418090
43/6S Hohner Stitching Heads used in exercise book making line
Hohner Stitching Heads Used in Exercise Book Making Machine
Hohner Stitching Heads Used in Exercise Book Making Machine
Hohner Stitching Heads Used in Exercise Book Making Machine
Hohner Stitching Heads Used in Exercise Book Making Machine
Hohner Stitching Heads Used in Exercise Book Making Machine

Hohner Stitching Heads Used in Exercise Book Making Machine


Specifications

1. Notebook binding machine
2. Can binding bicombinant, triunion, tetratherapy or more connection
3. Germany quality
4. Can set up the saddle stitching heads by demand

Features:

Semi-automatic Saddle-stitching Machine is professional bookbinding machine which specialized in binding kinds of school exercise books, notebooks, and so on. Lt stitching the books by wire riding bookbinding. Lt usually adopt to six, eight or ten Hohner stitching heads bookbinding to bind triunion, tetragenous and tetratherapy at the same time. Then the user can cut them to three books, four books or five books by the Book Cutting Machine.


Remark:

1.  Delivery time:
Around 45 days after receiving the deposit before the shipment. Please contact us for the exact delivery time.

2.  Installation and commissioning:
The seller is responsible for the installation and training. The buyer should cover the all of expense for the seller's engineers, such as air-tickets, accommodation, and medical expense and local traffic charges in Buyer's side. Besides, the buyer should do his best to cooperate in installation, supply the enough labors and tools, necessary accessory with them.
One engineer will be dispatched to the buyer place to work free for two weeks, for installing and training.
The training charge is free for two weeks, if the buyer needed to extend the training time, he must pay for the engineer as allowance.

3.  Guarantee period and maintenance:
Seller guarantees that the equipment is accordance with the function and requirement without manufacturing defects. The guarantee period is one year after the installation and adjustment.  

Buyer is responsible for the costs including maintenance and spare parts if the equipment damage is caused by the buyer's improper use, not caused by the seller's design and manufacturing.

4.  Packing and marking:
The machines are packed in wooden cases; all packing should protect the goods avoiding atmospheric influences.