Construction Tower Crane Qtz145f10 ( F0 /23B) Tower Crane-Max. Load 10t

China Construction Tower Crane Qtz145f10 (F0/23B) Tower Crane-Max. Load 10t, Find details about China Qtz100 Tower Crane, Building Tower Crane from Construction Tower Crane Qtz145f10 (F0/23B) Tower Crane-Max. Load 10t

Model NO.
QTZ145F10(F0/23B)
Type
Top-Slewing Crane
Power Source
Electric
Sling Type
Wire Rope
Application
Construction Usage
Trademark
Chico
Transport Package
Nude Packing, 40′hq
Specification
Max. Load 10t, Jib Length 50m, Tip Load 2.3t
Origin
China
HS Code
8426200
Model NO.
QTZ145F10(F0/23B)
Type
Top-Slewing Crane
Power Source
Electric
Sling Type
Wire Rope
Application
Construction Usage
Trademark
Chico
Transport Package
Nude Packing, 40′hq
Specification
Max. Load 10t, Jib Length 50m, Tip Load 2.3t
Origin
China
HS Code
8426200
Construction Tower Crane Qtz145f10 (F0/23B) Tower Crane-Max. Load 10t

QTZ145F10 Tower crane composes metal structure, mechanism deriving, hydraulic lifting, power control and safeguard. The detailed information as follows:
The foundation frame is fixed on the special concrete foundation. The upper part of the frame connects with the tower mast, and the upper part of the crane mast connects with the lower supporting board which connects the lifting jacket. The other end of the lower supporting board fixed to the slewing bearing's outer circle.

The rotary parts which fixed to the inner part of slewing bearing including the upper rotary platform, tower cap, balance arm, jib boom, range changing cart and the hook, counterweight, hoisting mechanism as well as slewing mechanism and the driver's cab. All the parts can make a 540° Rotary around the crane.
The jib boom connects the tower cap by two draw bar while its root part connects the upper rotary platform by bolts.

Hoisting mechanism is at the middle rear end of the balance arm. The right of the slewing platform is the slewing mechanism and the left part is driver's cab. Both the range changing cart and the hook are on the root part of the jib boom, guiding by the derricking speed mechanism, shifts on the jib boom.
The height of the crane includes the height of foundation and standard section. The independent crane composes 13 sections. The equipment to match the anchorage device should be fixed on the right position in advance.

Construction Tower Crane Qtz145f10 (F0/23B) Tower Crane-Max. Load 10t


Construction Tower Crane Qtz145f10 (F0/23B) Tower Crane-Max. Load 10t
Construction Tower Crane Qtz145f10 (F0/23B) Tower Crane-Max. Load 10t
Construction Tower Crane Qtz145f10 (F0/23B) Tower Crane-Max. Load 10t
Construction Tower Crane Qtz145f10 (F0/23B) Tower Crane-Max. Load 10t
Construction Tower Crane Qtz145f10 (F0/23B) Tower Crane-Max. Load 10t